Similar Projects
Windler Master Planned Community
New Construction - 1,900,000 SF
Conception
Aurora, CO

Second Creek Farms
New Construction
Design
Commerce City, CO 80022

Grange Hall Creek Park Rehabilitation
New Construction
Post-Bid
Less than $2,800,000 est. value
Thornton, CO 80233

Downtown Westminster Block A4 Woonerf and Park Project
Infrastructure
Post-Bid
Westminster, CO 80020

Waterslide and Play Structure Maintenance Services - Outdoor Leisure Pool at Pioneer Park
Results
Less than $50,000 est. value
Commerce City, CO 80022

Reunion Southlawn Sports Court
New Construction
Results
Commerce City, CO 80022

Link Apartments Fitzsimons
New Construction - 299,970 SF
Construction
Aurora, CO

Alice Sweet Thomas Park Tennis Court Repairs
Renovation
Post-Bid
Arvada, CO

Observatory Park Playground and Resurfacing
Results
Brighton, CO 80601

Sports Court Multi-Term
New Construction
Post-Bid
Brighton, CO

Turnberry Park Skate Feature
New Construction
Results
Commerce City, CO 80022

Basketball and Pickleball Courts
Renovation
Post-Bid
Brighton, CO 80601

Aurora Parkway Medians
Renovation, Infrastructure
Results
$650,000 to $750,000 est. value
Aurora, CO

Park Amenities
Renovation
Post-Bid
$45,000 est. value
Brighton, CO

Canterbury Park Renovation
Renovation
Results
$1,130,000 to $1,180,000 est. value
Aurora, CO

Last Updated 05/19/2022 02:50 PM
Project Title

Wyco and Danahy Sports Court Renovation Project

Physical Address View project details and contacts
City, State (County) Northglenn, CO 80233   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Build Team (DBT) to demo, design, furnish, and reconstruct a total of five (5) tennis courts and a bocce ball court at two separate parks through the Request for Proposal (RFP) process. The intent is to design and reconstruct three tennis courts and lighting at Wyco Park (Project A), reconstruct two tennis courts at Danahy Park (Project B) and design and construct a bocce ball court at Danahy Park (Project B) during the 2022 fiscal year. This project will occur at two separate parks in Northglenn and mobilization at each park should be considered whendeveloping the proposal. The project consists of reconstructing new post-tension concrete courts, five (5) reconstructed tennis courts with underdrains, and installing a new chain-link fence with gates around the perimeter, similar to how the courts are currently set up (Project A & B). The tennis courts will be reconstructed in approximately the same location. The third tennis court, closest to the basketball courts, at Wyco Park (Project A) will be striped to accommodate a multipurpose court dual striped for tennis and pickleball or four (4) pickleball courts perpendicular to the tennis courts. The project will include new LED lighting and new posts to replace the existing tennis court lighting a Wyco Park (Project A). At Danahy Park (Project B), a new concrete pad for bocce ball will be constructed and fitted wit appropriat surfacing and tied into the existing park amenities via a sidewalk or path. The project will include a lighting assessment, repair, and/or replace existing tennis court lighting at Danahy Park (Project B). Each sports court location will include all the appropriate equipment and park amenities for turnkey operation.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents