Similar Projects
Last Updated | 08/05/2020 09:06 AM |
Project Title | Rehabilitation Construction Project for 1478 Piney Road |
Physical Address | View project details and contacts |
City, State (County) | Fort Myers, FL 33903 (Lee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Septic System: Install new/replace existing septic system as defined on permit number 36-SN-2093648. If a lift, dosing pump, grease trap, etc., and related electrical/plumbing provisions, are required by the Health Department Permit for this job, it shall be included in the base bid including all related permits. Excavate drain field and remove material (or old drain field, as applicable) and properly dispose of excavated material (“dumping” on vacant lots or any other unauthorized area is not allowed). Pump out existing septic tank and replace as defined on permit number 36-SN-2093648. Repair lawn/landscape irrigation systems as required (if existing) to accommodate septic system work. It is recommended that the contractor avoid driving vehicles, equipment or dumping materials on driveways, sidewalks or patios. If the contractor damages driveways, sidewalks, fences, landscaping, lawn/landscape irrigation systems, underground wiring, underground plumbing, the home, or personal items belonging to the homeowner, or any other items on the premises as a result of the septic system installation/repair, the contractor shall repair/replace said item(s) to the homeowner’s satisfaction. It is the contractor’s responsibility to contact all associated utilities for marking of underground services and to discuss with the homeowner if they have knowledge of any underground systems, utilities or hazards. New septic system and all areas disturbed by the removal of the old septic system and/or installation of the new septic system shall be properly graded and re-sodded with same sod type as existing. If no existing sod is present (only weeds) then the contractor shall re-sod areas disturbed during the septic installation/repair with Bahia sod. When work is complete, no bare earth shall be allowed in all yard/lawn areas affected by septic repair. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |