Similar Projects
Upgrade to Sanitary Sewer Pump Station
Renovation
Post-Bid
Brunswick, ME

Z--ACAD 312255 Rehab Schoodic Water System
Renovation, Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
New Sweden, ME 04762

Oak Grove Pump Station Improvements
Results
Brewer, ME

Baxter Boulevard Pump Station Upgrades
Renovation
Results
Portland, ME 04103

Pump Station 2 & Passamaquoddy Road Sewer & Water System Improvements
New Construction, Demolition - 17,060 SF
Construction
Perry, ME 04667

Horrigan Court Pump Station Upgrade
Renovation
Post-Bid
Biddeford, ME 04005

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Results
$500,000,000 est. value
Kittery, ME

Hospital Street Booster Station Upgrades
Results
Augusta, ME 04330

Water Street Pump Station Upgrades Pump Procurement Project
Results
Ellsworth, ME 04605

Kennebec Sanitary District Main Pump Station Force Main Upgrade
Results
$640,000 est. value
Waterville, ME

Pump Station 5 - Wildwood
Renovation
Results
Augusta, ME 04330

Gilpatrick Cove and Garry Moore Pump Station Improvements
New Construction
Results
Mount Desert, ME

North Yarmouth Booster Pump Station
New Construction
Results
North Yarmouth, ME 04097

Pump Station and Sewer Extension
Results
Less than $3,810,000 est. value
Poland, ME

WWTF and Pump Stations
New Construction, Renovation
Results
Bridgton, ME

Last Updated 04/14/2022 01:52 PM
Project Title

Cove Road and Washington Street Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Camden, ME 04843   (Knox County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,165,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of renovations to the Cove Road and Washington Street Pump Stations. Work at the Cove Road Pump Station includes renovations to the existing electrical enclosure, pump station drywell renovations, installing new dry-pit submersible pumps, installing a new outdoor standby power generator, new force main bypass assembly and miscellaneous pump station support system upgrades. Work at the Washington Street Pump Station includes constructing a new electrical building, converting the station to a submersible pump station with new pumps installed in the existing wet well, installing a new outdoor standby power generator, new force main bypass assembly and miscellaneous pump station support system upgrades.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents