Similar Projects
Roundabout Construction - TH 210
Infrastructure
Conception
$1,200,000 CJ est. value
Pillager, MN 56473

Cass Lake Clinic Phase 2.2 Expansion Project
Addition, Infrastructure - 49,024 SF
Post-Bid
$12,000,000 CJ est. value
Cass Lake, MN 56633

Wild Ricing Site Access Improvement Project
Infrastructure
Post-Bid
$250,000 CJ est. value
Cass Lake, MN 56633

2022 Taxilane Extension
Infrastructure
Results
$189,880 CJ est. value
Longville, MN 56655

Williams Road Overlay
Infrastructure
Results
$343,160 CJ est. value
Cass Lake, MN 56633

Cass Lake Bena Elementary School
New Construction, Infrastructure - 95,000 SF
Construction
$25,000,000 CJ est. value
Cass Lake, MN 56633

Cass Lake - Bena Elementary School - BID CATEGORIES 2 & 33 RE-BID
New Construction, Infrastructure - 95,000 SF
Construction
$25,000,000 CJ est. value
Cass Lake, MN 56633

17th Avenue Paving Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Woodrow Township, MN 56452

Bituminous Removal/Milling and Paving, Concrete C and G /Sidewalks, ADA Ped Ramp
Infrastructure
Results
$915,522 CJ est. value
Walker, MN 56484

FY 2024 Sidewalk Improvements
Infrastructure
Post-Bid
$50,000 CJ est. value
Oshawa, MN 56435

Grading, Bituminous Surfacing and ADA Improvements
Infrastructure
Results
$2,278,000 CJ est. value
Remer, MN 56672

Culvert Replacement & Culvert Repair
Infrastructure
Post-Bid
$600,000 CJ est. value
Oshawa, MN 56435

Overlay Program
Infrastructure
Results
$6,797,706 CJ est. value
Oshawa, MN 56435

Grading, Bituminous Surfacing
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Federal Dam, MN 56641

2023 East Viking Boulevard Improvement Project
Infrastructure
Results
$1,846,621 CJ est. value
Oshawa, MN 56435

Last Updated 01/04/2024 05:34 PM
Project Title

Spire Valley Hatchery Spring Cover

Physical Address View project details and contacts
City, State (County) Remer, MN 56672   (Cass County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $265,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 4, 2024, the project has not been awarded. A timeline for award has not been confirmed. This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Installation of a new pole building to cover an existing natural spring. 2. The pole building foundation will be comprised of stacked gabion bales with concrete sonotube piers at each post location. 3. Electrical lighting in the pole barn and at exterior doors. 4. Electrical outlets in the pole barn. Est. Completion Date: June 30, 2023 All questions should be submitted no later than 2:00 PM, March 24, 2023: The State is not obliged to answer questions submitted after the question due date and time. Rick Clark, MN DNR Architect, Project Manager 651-259-5419 rick.clark@state.mn.us

Details

2,029 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents