Similar Projects
HVAC Controls Project at Hilltop High School
Renovation
Sub-Bidding
$657,319 CJ est. value
Chula Vista, CA 91910

Refrigeration Unit, Walk-In, Combination Cooler/Freezer Replacement
Renovation
Sub-Bidding
$115,000 CJ est. value
San Diego, CA 92111

OR Suite HVAC Replace in Building I
Alteration
Post-Bid
San Diego, CA 92161

Heating, Ventilation, and Air Conditioning (HVAC) Duct System Maintenance Services (Oceanside DMV Field Office)
Term Contract, Alteration
Post-Bid
$15,000 est. value
Oceanside, CA 92056

OR Suite HVAC Replacement In Bldg 1, Project 664-21-302
Term Contract
Results
$2,000,000 to $5,000,000 est. value
San Diego, CA 92161

HVAC Maintenance Services
Term Contract
Results
Oceanside, CA

CHP El Cajon HVAC Maintenance
Term Contract
Sub-Bidding
El Cajon, CA 92021

La Cima CC HVAC Replacements
Alteration
Post-Bid
Julian, CA 92036

SDIA- Airport Administration Building - HVAC
Alteration
Results
San Diego, CA 92101

CHP Oceanside HVAC Maintenance
Term Contract
Sub-Bidding
Vista, CA 92081

Mission Valley HVAC Upgrade Project
Term Contract
Post-Bid
$1,496,000 est. value
CA

HVAC Installation at Mendoza and Nicoloff Elementary
Alteration
Results
$645,000 est. value
San Diego, CA 92154

Citywide HVAC Preventive Maintenance and Inspection Services
Term Contract
Sub-Bidding
Carlsbad, CA 92008

HVAC - Chula Vista Veterans Home
Renovation
Post-Bid
$200,000 CJ est. value
Chula Vista, CA 91911

New Cooling Tower
Alteration
Results
$200,000 est. value
Poway, CA 92064

Last Updated 12/06/2022 03:08 PM
Project Title

Kearny Mesa Headquarters HVAC Equipment Replacement

Physical Address View project details and contacts
City, State (County) San Diego, CA 92123   (San Diego County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $834,900 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of Nov 10 the project is set to be awarded on Nov 17 by the Board . Replace HVAC equipment at the Water Authority's headquarters building located in Kearny Mesa. Equipment includes two 90-ton "boxcar" air conditioners; one 7-ton air conditioner; two server room air conditioning unit coils; one water heating boiler and base; one boiler pump; heating system valves. Replacement 90-ton HVAC units will be Trane Intellipack, model number SXHKC904, to replace existing Trane HVAC units with minimal mounting, ducting, and electrical modifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents