Similar Projects
Last Updated | 08/09/2022 09:06 AM |
Project Title | Topeka Infrastructure Projects - Project B: West Lake Park Improvements |
Physical Address | View project details and contacts |
City, State (County) | Topeka, IN 46571 (Lagrange County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bids shall be submitted in an enclosed opaque sealed envelope, marked "Topeka Infrastructure Projects - Project B: West Lake Park Improvements". Bids will be evaluated, and it is the intent that an award of contract be made within 60 days of the bid opening. This work involves the construction and/or improvements at the West Lake Park including but not limited to site and pavilion demolition, site grading and drainage improvements, site utility improvements, new sidewalk, new pavilion construction, site restoration, landscaping, and other park improvements. The work to be performed and the bids submitted, including any and all separate and combination bids, shall include sufficient and proper sums for all General, Construction, Mechanical, Electrical, Installation, Labor, Materials, Tools, Equipment, Taxes (both Federal and State), Permits, Licenses, Insurance, Service Costs, and so forth, incident to and required for the construction of the facilities. Each Bidder is responsible for inspecting the Project Site and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omissions of any Bidder to do any of the foregoing shall in no way relieve the Bidder from any obligation with to its Bid. All materials furnished, and labor performed incident to and required for the proper and satisfactory execution of the contracts shall be furnished and performed in accordance with the requirements of the contract documents as defined in the General Conditions of the Construction Contract, and any addenda thereto, prepared by the Engineer, DLZ Indiana, LLC. Said drawings are on file for viewing in the office of the following: Engineer, 825 S. Barr Street, Fort Wayne, IN 46802; the Owner, Town Hall, 124 East Lake Street, Topeka, IN 46571; and the CMc, FCI Construction, 260- 927-8516. Each bid shall be accompanied by a Certified Check or acceptable Bidder's Bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate proposal, which check or bond will be held by the Owner as evidence that the Bidder will, if awarded a contract or contracts, enter into the same with the Owner upon notification from him to do so within fourteen (14) days of said notification. Failure to execute a contract in full and unedited as hereinafter set out will be cause for forfeiture to the Owner of the amount of money represented by the Certified Check or Bidder's Bond, as and for liquidated damages. Bids shall be properly and completely executed on bid forms provided by the Engineer which shall include the Non-Collusion Affidavit. Each bid shall also include the revised Indiana Questionnaire Form No. 96, all as required by Statute. Responsible bidder shall show experience in the construction of park facilities and must be qualified as required by local county and state requirements. No bids shall be withdrawn after the opening of bids without the consent of the Owner for a period of sixty (60) days after the scheduled time of receiving same. FCI Construction reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make combination of bids as may seem desirable, and to waive any and all informalities in the bidding. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |