Similar Projects
Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Downtown Doral PS0014 Reconstruction Sanitary Sewage Pump Station
Results
Less than $2,569,209 est. value
Doral, FL 33174

Last Updated 02/28/2020 10:44 AM
Project Title

Sunland Estates Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Sanford, FL 32771   (Seminole County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $870,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installing a new lift station (including new pumps, electrical, controls, and generator), removal of the existing lift station and force main (including demolition of the lift station concrete block building), and construction of over 1100 ft of new force main 6"-8", over 200 ft of new 12" sanitary sewer and one new sewer manhole. furnish all materials, equipment, tools, and labor which is reasonably and properly inferable and necessary for the proper completion of the work, whether specifically indicated in the contract documents or not. reference section 01410 - regulatory requirements and permits concerning permits secured by the owner and permits to be secured by the contractor. other licenses or permits for construction facilities of a temporary nature that are necessary for the prosecution of the work shall be secured and paid for by the contractor. Repair, replace, or otherwise settle with the Owner, if damage to property or existing facilities occurs, including damage to pavements, utilities, lawns, structures, etc.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents