Similar Projects
0.23 MI of Hot Mix Asphalt Shared-Use Path
Infrastructure
Bidding
MI

Concrete Sidewalk Replacement and Repairs (CDBG)
Infrastructure
Bidding
Bay City, MI

Parking Lot 62W-IM West Reconstruction
Post-Bid
East Lansing, MI

2020 Ramp and Sidewalk Repair Program
Post-Bid
Ann Arbor, MI

211 Monroe Parking Lot Resurfacing
Results
Less than $24,134 est. value
Saline, MI

1.60 MI of Hot Mix Asphalt Shared use Path, Earthwork, Restoration and Pavement Markings
Results
MI

Long-Term Parking Expansion: Pavements, Drainage & Lighting
Alteration
Bidding
$1,500,000 to $2,000,000 est. value
Traverse City, MI

ADA Sidewalk Replacements
Post-Bid
Muskegon, MI

Portage Road Trailway
Results
Less than $400,500 est. value
Portage, MI

Pine Ridge Joint Repair
Infrastructure
Bidding
Fraser, MI

Fiedler Elementary Parking Expansion Acoustic Panels/Painting
Post-Bid
Flint, MI

Parking Lot Analysis Services
Results
MI

Track Reconstruction
Post-Bid
Cadillac, MI

Innovation Hills Kayak Landing
Results
Rochester Hills, MI 48309

2020 Sidewalk Gaps and Replacement Program
Post-Bid
Plymouth, MI

Last Updated 07/09/2021 12:07 PM
Project Title

M-553 Curb and Gutter Replacement in Marquette

Physical Address View project details and contacts
City, State (County) Marquette, MI   (Marquette County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents