Last Updated 07/02/2021 09:58 AM
Project Title

Road Construction at West of Porter Road, and West of Ventana Prairie Drive (Clay Road 2)

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of, but is not limited to, the construction of approximately 3,340 linear feet of asphalt pavement and 1291 linear feet of reinforced concrete pavement section. Roads will be reconstructed as four-lane boulevards. Clay Road will be asphalt with roadside ditches and a 14-ft median. Porter Road will be reinforced concrete with curb and gutter and a 32-ft median. A multiple box culvert crossing of Porter Road by the U201-09-00 will be accomplished; and a new mast arm traffic signal provided at the Porter Road intersection, within Harris County Precinct 3.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents