Similar Projects
145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

Ninth Elementary Addition
New Construction
Design
$28,900,000 est. value
Lakeville, MN 55044

Suite Living of Rosemount
New Construction, Infrastructure
Design
$10,300,000 CJ est. value
Rosemount, MN 55068

New County Library at Marie and 7th Avenues - Dakota County
New Construction, Infrastructure - 16,146 SF
Post-Bid
$6,000,000 CJ est. value
South Saint Paul, MN 55075

Hydro Vacuum Excavation Services 2022
Infrastructure
Post-Bid
Falcon Heights, Lauderdale, Maplewood, Mendota Heights, Saint Paul, West Saint Paul, MN

Spring Lake Park Reserve Ravine Stabilization
Infrastructure
Results
Rosemount, MN 55068

Spring Lake Park Reserve (SLPR) Bison Range - Bid Package 2 Site Improvements
Infrastructure
Results
$450,000 est. value
Hastings, MN 55033

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

City of Hastings Storage Building
New Construction, Infrastructure - 11,200 SF
Construction
$1,147,000 CJ est. value
Hastings, MN 55033

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Amber Fields
New Construction, Infrastructure
Pending Verification
$740,500,000 CJ est. value
Rosemount, MN 55068

Antlers Community Park - P-9 - City of Lakeville
Infrastructure
Conception
$11,575,000 CJ est. value
Lakeville, MN 55044

Aldi #74 / Farmington
New Construction, Infrastructure - 22,245 SF
Design
$3,200,000 CJ est. value
Farmington, MN 55024

Obama CMA Services
Renovation, Addition
Post-Bid
Saint Paul, MN 55104

Last Updated 12/19/2022 03:04 PM
Project Title

New Elementary No. 9 Bid Pack C

Physical Address View project details and contacts
City, State (County) Lakeville, MN 55044   (Dakota County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 2022 this project is underway. This project includes: A new 100,000 square foot elementary school. This Bid Package C includes: The remainder of the project scope. The due date for any questions regarding the New Elementary No. 9 Bid Package C shall be submitted in writing to Loeffler Construction & Consulting by 5:00 p.m. on July 8, 2022. Submit questions to Eric Prettyman at eprettyman@loefflerconstruction.com Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Independent School District #194 in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before March 6, 2024.

Details

100,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents