Similar Projects
Medium Density Residential
New Construction
Conception
Salt Lake City, UT 84116

The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

DFCM Construction- UU Auxiliary Svcs West Village Family/Graduate Housing-22011750-VBS DB Stg II
New Construction - 442,000 SF
Bidding
$109,525,000 est. value
Salt Lake City, UT 84108

DFCM Construction - VBS CX Services - UU West Village Family and Graduate Housing
New Construction, Alteration - 442,000 SF
Bidding
$109,525,000 est. value
Salt Lake City, UT

The Zephyr
New Construction - 99,892 SF
Sub-Bidding
$6,827,300 est. value
Salt Lake City, UT 84101

Saint Mark`s Tower Window Replacement
Renovation - 89,248 SF
Post-Bid
Salt Lake City, UT

Alta Depot
New Construction - 434,303 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84102

525 Plaza Building Parking Structure Repair
Results
$1,721,332 est. value
Salt Lake City, UT 84102

Dfcm Construction-Uu Hs Garage, Roadway, Ped Connector/Mario Capecchi Intersection
Results
est. value
Salt Lake City, UT

Upper West Apartments
New Construction - 315,535 SF
Construction
West Jordan, UT 84088

Block 67
New Construction - 430,000 SF
Construction
$5,454,500 est. value
Salt Lake City, UT 84111

Huddart Lofts
New Construction - 60,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Salt Lake City, UT

Huddart Lofts
New Construction - 60,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Salt Lake City, UT

Last Updated 06/24/2021 02:18 PM
Project Title

South Cairns Development

Physical Address View project details and contacts
City, State (County) Sandy, UT 84070   (Salt Lake County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Hotel/Motel, Office, Parking Garage
Contracting Method General Contractor to Subcontract.
Project Status Construction Documents, Construction Start Expected third quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, 18 Stories Above Grade, New Construction, Hotel/Motel, New Construction, Apartments/Condominiums, New Construction, 204, 2 Parking Garage, New Construction 1700 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents