Similar Projects
Last Updated | 12/14/2021 02:32 PM |
Project Title | Construction of Detention Pond for the Precinct 3 North Library |
Physical Address | View project details and contacts |
City, State (County) | TX (Fort Bend County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $945,485 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes, but is not limited to, storm water pollution prevention plan (SWPPP) NOI, stabilized construction access, fencing, inlet protection, inspection, maintenance and general source controls; excavation of swales and on-site disposal; excavation, removal and disposal of concrete pipe and inlet; excavation and installation of reinforced concrete pipe with grated screen and reinforced concrete headwall; connection of reinforced concrete pipe to an existing manhole; excavation and installation of reinforced concrete slope paving, back slope interceptors and corrugated metal pipe with backfill and bedding; excavation and installation of riprap; trench safety; excavation and installation of reinforced concrete box, bends and pipe with backfill and bedding; pedestrian walkway bridge with reinforced concrete abutments; hydromulch seeding and chain link fencing and gates. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |