Similar Projects
Reported | 05/10/2022 12:00 AM |
Project Title | Construction Manager - CMGC Services for Prosper Wastewater Treatment Plant (WTP) and Water and Wastewater Treatment Plant (WWTP) all Improvements |
Physical Address | View project details and contacts |
City, State (County) | Watkins, CO 80137 (Adams County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $18,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | VE Goal: $16 million Estimate. The Owner contracted with Evoqua (now a division of Dupont) for supply of the MBR Process Equipment. The original scope of supply for MBR equipment to be provided as Owner furnished is detailed in Appendix B to the WWTP bidding documents. The WWTP project was released for bid in 2019 but was not awarded. Subsequent to the WWTP bid, the MBR supply contract was terminated. The majority of the MBR equipment was delivered to the Owner in 2020 and has been stored and maintained since that time. As part of the termination of the MBR Equipment contract, a portion of the original scope of supply was removed from the contract including membrane modules, specialty membrane tools, unused engineering and field services, and warranty coverage. Concurrent with the CMGC selection process and during the preconstruction phase of the project, the Engineer will coordinate with the MBR Manufacturer to obtain a proposal for the omitted materials and services and for extension of warranty coverage. The intent is that the CMGC will enter into an agreement with MBR manufacturer to provide the necessary remaining equipment, services, and warranty coverage to support the installation, startup, and commissioning of the MBR system including both Owner and Contractor furnished items. Prosper Water Treatment Plant The water treatment plant (WTP) scope includes a building housing pumps; chemical storage, pumping, and metering equipment; HVAC equipment; piping and valves; instrumentation; and other ancillary items. A separate room in the building houses the electrical equipment for the facility. A clear well sits under a portion of the building. A water tower and associated equipment is located on the site adjacent to the building. Rough grading was completed at the WTP site in 2019. Two existing wells and an associated metering vault, electrical, instrumentation, and control equipment, and piping are located on the site adjacent to the building. The power and control for the existing wells will be tied into the power and control for the WTP. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |