Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Upgrade Domestic Hot and Cold Water Systems
Term Contract
Bidding
$5,000,000 to $10,000,000 est. value
San Diego, CA 92161

San Joaquin Pipeline Valve and Safe Entry Improvements - Phase 1B
Infrastructure
Bidding
$14,000,000 est. value
Stockton, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Sub-basin BD Drainage Ditch - 50280 - City of Chico
Infrastructure
Conception
Less than $266,845 est. value
Chico, CA 95927

Pipeline 5 Relining, North Twin Oaks Valley Road to Crossover Pipeline Turnout
Infrastructure
Bidding
$27,000,000 est. value
San Diego, CA

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Hollenbeck Pipe Improvements Project - City of Covina
Infrastructure
Conception
Covina, CA 91723

Maintenance District 10A - Madera Ranchos Water System Improvements Project - Phase II
Term Contract
Bidding
$4,489,252 est. value
Madera, CA 93636

Reported 06/28/2022 11:16 AM
Project Title

Mad River Pipeline Valve Replacement - City of Eureka

Physical Address View project details and contacts
City, State (County) Eureka, CA   (Humboldt County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Eureka, California. Conceptual plans call for site work for a water / sewer project. A series of valves on the Mad River Pipeline, the main water transmission line to the Greater Eureka Area, have been found to not operate fully. The valves in question do not close fully creating operational difficulties as well as major issues when emergency repairs are needed on the main. This project will replace the faulty valves to restore operational and emergency functionality. This Project is in included in the City of Eureka 2022-2027 Capital Improvement Plan (CIP). As of June 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents