Similar Projects
Section 4 Walnut Street Bridge Pipe Restraint Replacement
Infrastructure
Bidding
$180,000 est. value
Somerville, MA

Fire Hydrants
Infrastructure
Bidding
Billerica, MA

Kenwood Water Distribution System
Term Contract
Post-Bid
Dracut, MA 01826

2020 Lead Water Service Replacement Program
Post-Bid
Less than $1,500,000 est. value
Winchester, MA

Temporary Potable Water Conveyance
Term Contract
Results
Littleton, MA 01460

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Main Cleaning and Lining on Main Street (Route 28)
Post-Bid
Less than $1,800,000 est. value
Stoneham, MA

2020 Water Main Improvements
Results
Less than $750,000 est. value
Melrose, MA 02176

Hanscom AFB Steam Traps
Post-Bid
Bedford, MA 01731

2020 Water System Improvements
Results
$1,800,000 est. value
Concord, MA 01742

Water Works Materials
Post-Bid
Cambridge, MA

Rehabilitation of WASM 3 Sections W11/W12/W16/51
Results
Less than $13,992,000 est. value
Arlington, Medford, Somerville, MA 02129

Furnish and Deliver Construction Materials for the Water Department
Post-Bid
Cambridge, MA 02139

Fire Hydrants
Results
Bedford, MA

Furnish and Deliver Water Meters for FY21
Term Contract
Post-Bid
Ayer, MA

Last Updated 10/21/2021 03:24 PM
Project Title

Advanced Metering Installation Services

Physical Address View project details and contacts
City, State (County) Watertown, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes furnishing all labor materials, equipment and incidentals necessary to remove existing water meters, registers, wiring and reading devices, including those in meter pits, and the installation of the new water meters, registers, wiring, and AMI modules. The Municipal Agency is purchasing the new water meters, registers and AMI Modules under a separate contract. The scope of work also includes ensuring there is adequate electrical bonding on both sides of the newly installed water meters and conducting a visual inspection of the immediate area around the newly installed water meters to determine whether a sump pump is present and whether there is proper discharge. The AMI includes installing approximately 9,844 water meters ranging from 5/8-inch to 6-inch in size, registers, radio modules.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 22 - Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents