Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Forest Cove Sanitary Lift Station Replacement
Post-Bid
Waukegan, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Sealcoating and Striping at Various Locations
Results
Lake Zurich, IL

Rollins Road Water Main Improvements
Post-Bid
$168,300 est. value
Waukegan, IL

2021 Road Program
Results
Lake Zurich, IL

Butler Lake Parking Lot Resurfacing
Infrastructure
Post-Bid
Libertyville, IL 60048

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Hydrant Assemblies 2021-2022
Term Contract
Post-Bid
Waukegan, IL

2021 Street Maintenance
Results
IL

2021 Road Repairs
Term Contract
Post-Bid
Antioch, IL

Last Updated 10/12/2022 12:08 AM
Project Title

Rockland Road Corridor Flood Reduction Project

Physical Address View project details and contacts
City, State (County) Libertyville, IL 60048   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work generally described as follows: Replacement of the storm sewer system, construction of full depth HMA pavement, pavement resurfacing, sidewalk replacement, combination concrete curb and gutter installation, driveway reconstruction, erosion control, and all necessary restoration. substantially complete the Work by November 18th, 2022 plus 5 working days for punch list items ("Completion Date").

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents