Similar Projects
Brandon Middle School Renovations
Renovation
Conception
Ortonville, MI 48462

Roof Restoration - Ice Arena - ICE022 - City of Novi
Alteration
Conception
$875,000 est. value
Novi, MI 48375

Air Conditioning and Quality Improvements Package 4 - 2022 Bond - Lansing School
Renovation
Design
$4,100,000 est. value
Lansing, MI

Burgtorf Building - 2022 Bond - Kearsley Community Schools
Renovation
Design
$2,000,000 est. value
Flint, MI 48506

Bus Garage and Office Construction
New Construction
Bidding
$2,000,000 est. value
Bangor, MI 49013

Yale Junior High School 2022 Renovation
Renovation
Bidding
$380,000 CJ est. value
Yale, MI 48097

Terminal Roof Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Flint, MI 48507

Public Address System Bangor Public Schools HS/MS
Renovation
Sub-Bidding
$100,000 CJ est. value
Bangor, MI 49013

Ypsilanti Community Schools Erickson Reroof Project
Post-Bid
Ypsilanti, MI 48197

Alanson Public Schools 2020 Bond Issue Remodeling
Post-Bid
Alanson, MI 49706

Roofing Repair and Replacement Services
Term Contract
Results
Allen Park, Dearborn, Detroit, Fort Gratiot, MI 48226

Roofing Repair and Replacement Services
Term Contract
Results
Allen Park, Dearborn, Detroit, Fort Gratiot, MI 48226

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B
Renovation - 19,550 SF
Construction
Bloomfield Hills, MI 48301

Safety and Security - 2022 Bond - Warren Consolidated Schools
Renovation, Infrastructure
Pending Verification
$13,750,000 CJ est. value
Warren, MI 48093

Paw Paw Public Schools 2021 Bond - High School Cafeteria Addition
Addition
Design
$2,000,000 est. value
Paw Paw, MI 49079

Last Updated 08/12/2022 12:10 PM
Project Title

Cheboygan Area High School Partial Reroof

Physical Address View project details and contacts
City, State (County) Cheboygan, MI 49721   (Cheboygan County)
Category(s) Education, Single Trades
Sub-Category(s) Middle/Senior High School, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $389,792 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Cheboygan Area High School is located at 801 W. Lincoln Ave. in Cheboygan, Michigan. Seidell Architects, Todd Seidell is the Owner's Representative and may be contacted regarding any questions, phone 989-731-0372 B. The project consists of installing Versico's VersiWeld TPO Mechanically-Fastened Roofing System as outlined below: : Apply the VersiWeld Mechanically Attached Roofing System with the RhinoBond TPO Welding Plate in conjunction with (2) layers of 2" flat and (1) fully tapered polisocyanurate insulation system after removal off all existing stone ballast and existing roofing systems to expose the existing roof deck for verification of suitable substrate as specified in this specification. Existing stone ballast to be removed from the construction site. A. Provide all labor, material, tools, equipment, and supervision necessary to complete the tear off and installation of the VersiWeld reinforced TPO (Thermoplastic Polyolefin) membrane Mechanically Attached Roofing System including flashings and insulation as specified herein. And as in accordance with the manufacturer's most current specifications and details. B. The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. C. The roofing contractor shall confirm all given information and advise the building owner, prior to bid, of any conflicts that will affect their cost proposal. D. Any contractor who intends to submit a bid using a roofing system other than the approved manufacturer must submit for pre-qualification in writing fourteen (14) days prior to the bid date. Any contractor who fails to submit all information as requested will be subject to rejection. Time is of the essence to the owner. A construction schedule will be developed and will need to be followed. We plan to begin work in mid-July, 2022 (one week after school ends) and to be completed by mid-August, 2022 (two weeks before school begins).

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents