Similar Projects
Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2022 Additions and Renovations at Prairie Junior High School
Renovation, Addition
Bidding
$1,250,000 to $1,300,000 est. value
Alsip, IL 60803

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Phase IV Group 3 STR
Results
Chicago, IL 60607

Phase IV Group 5
Results
Chicago, IL

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Phase IV Group 4 STR
Results
Chicago, IL

Maine South High School
Post-Bid
Park Ridge, IL

2021 Renovations at Winnetka and Northfield Campus Bid Period 1
Renovation
Results
Northfield, Winnetka, IL 60093

Prairie MS Campus and Station MS Campus
Post-Bid
Barrington, IL

ROF at Davis Elementary School and Madero Middle School
Results
Chicago, IL 60632

Skinner North and Hawthorn ROF
Post-Bid
Less than $8,600,000 est. value
Chicago, IL

Last Updated 06/06/2022 07:53 AM
Project Title

Transition Center Renovation - Phase One

Physical Address View project details and contacts
City, State (County) Glencoe, IL 60022   (Cook County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interior renovation project. The general scope of work includes the initial phase of a planned two-year renovation of a one-story commercial property to create a Transitions Center for New Trier's special education department. The general scope of work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary for completion of the work indicated in the Bid Documents including, but not necessarily limited to, the following: cutting and patching, selective demolition, miscellaneous rough carpentry, interior finish carpentry, slatwall panel systems, plastic paneling, thermal insulation, penetration firestopping, fire-resistive joint systems, joint sealants, hollow metal doors and frames, flush wood doors, access doors and frames, aluminum-framed entrances and storefronts, door hardware, glazing, non-structural metal framing, gypsum board, acoustical panel ceilings, interior painting, visual display units, toilet, bath & laundry accessories, fire protection cabinets, plumbing, heating, ventilating and air-conditioning, electrical, structured cabling for voice and data, and extension of existing fire alarm system. Field Verification: Field verification of the existing conditions and the required scope of work are required prior to submission of a bid. The proposed work areas can be visited by making prior arrangements with the Owner by contacting the following individuals: Mr. Jim Maile Facilities Manager, Northfield Campus New Trier High School Northfield Campus, Room A105 7 Happ Road Northfield, IL 60093 Telephone: (847) 784-1461 Cell: (847) 204-2025 Email: mailej@newtrier.k12.il.us

Details

Middle/Senior High School, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents