Similar Projects
Big Papllion Sewer Siphon Replacement - SEWR-23-001 - City of La Vista
Infrastructure
Conception
$450,000 CJ est. value
La Vista, NE 68128

Thompson Creek West Edgewood - PARK23002 - City of La Vista
Infrastructure
Conception
$364,000 CJ est. value
La Vista, NE 68128

New Jail Development - Sarpy County
New Construction, Infrastructure - 146,000 SF
Design
$68,500,000 CJ est. value
Papillion, NE 68046

Aspen Creek Phase 6
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Gretna, NE 68028

Tiburon Ridge Waste Collection 2023
Infrastructure
Bidding
$200,000 CJ est. value
Gretna, NE 68028

Titan Springs 2023 Pavement Reconstruction
Infrastructure
Bidding
$600,000 CJ est. value
Papillion, NE 68046

Holiday Inn Express & Suites - Footings & Foundation Package / LaVista
New Construction, Infrastructure - 66,647 SF
Sub-Bidding
$25,000,000 CJ est. value
La Vista, NE 68128

NC3 Alert Campus
New Construction
Post-Bid
Offutt Air Force Base, NE

SCCWWA Phase 1A - Lift Stations (LS), Force Mains (FM), & Zweibel Creek - 3 Interceptor (ZC-3)
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Springfield, NE 68059

Offutt AFB Security Campus
New Construction - 30,300 SF
Results
$50,000,000 to $90,000,000 est. value
Offutt Air Force Base, NE

Papio Creek Intake Damper Replacement
Infrastructure
Results
$915,000 CJ est. value
Bellevue, NE 68123

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Gretna Crossing Park - Passive Park Improvements
New Construction, Renovation, Infrastructure
Construction
$7,583,000 CJ est. value
Gretna, NE 68028

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

New Laboratory - Offutt Air Force Base
New Construction, Infrastructure - 65,000 SF
Pending Verification
$50,000,000 CJ est. value
Offutt AFB, NE 68113

Last Updated 07/24/2023 04:17 PM
Project Title

Nebraska Army National Guard Bellevue Readiness Center (Milcon)

Physical Address View project details and contacts
City, State (County) Bellevue, NE 68123   (Sarpy County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $33,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 8, 2023, construction is underway. A groundbreaking ceremony was held in October 2022 and occupancy is expected in 2024, however, an exact timeline for construction has not been confirmed. This project includes all labor, equipment, tools, materials, travel, and licenses for construction of an approximately 95,000 square foot, two story Readiness Center for the Nebraska Army National Guard. The new facility includes, but is not limited to architectural, structural, civil, mechanical and electrical, security, and tele-communication and fire protection trades. The building includes the following spaces: offices, classrooms, storage areas, kitchen, service bays, assembly hall and other ancillary spaces. This project is being rebid under State of Nebraska contracting procedures and was previously bid but not awarded by Federal contracting. Project is to be built at 2602 Forbes Drive near South 25th Street and Capehart Road. The estimated construction cost range for this project is approximately $32 - $33 million. Estimated construction period to substantial completion is 720 days from the Notice to Proceed Letter. For questions contact Mr. Brandon Sire, PE at (402) 476-9700. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

2 Stories Above Grade, 95,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents