Similar Projects
Last Updated | 08/28/2021 12:05 AM |
Project Title | Deaerator Replacement GPC |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53704 (Dane County) |
Category(s) | Industrial/Manufacturing, Medical |
Sub-Category(s) | Heating/Cooling Plant, Hospital |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $800,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general the work consists of replacing the deaerator heater and storage tank at the Mendota Mental Health Institute central heating plant with a new unit. Selective demolition of the roof above the deaerator will allow the existing unit to be removed and the new unit to be brought onto the second floor of the building. Existing steam and feedwater piping will be replaced as necessary. The building envelope will be restored after the new unit is brought into the plant. Work will also include replacement of the original continuous blowdown flash tank, level control, safety valve, level indication, etc. |
||||||||||||||||
Details | Heating/Cooling Plant, New Construction.
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |