Similar Projects
Carver Complex Interior Finishes and HVAC Renovations
Alteration
Bidding
$200,000 to $7,500,000 est. value
Huntsville, AL 35811

Boiler Replacement at T. M. Elmore Gymnasium
Post-Bid
Huntsville, AL 35811

Alabama Supercomputer Center HVAC Systems Replacement
Alteration
Post-Bid
Huntsville, AL 35806

Horizon Elementary HVAC Renovation
Results
$3,264,000 est. value
Madison, AL 35758

Heritage Elementary HVAC Renovation
Results
$1,997,300 est. value
Madison, AL 35758

Sparkman High School Cooling Towers Replacement
Post-Bid
Harvest, Huntsville, AL 35749

Dublin Park H and V Unit Replacement Project
Results
Madison, AL 35758

AHU and Boiler Replacement Student Health and Wellness Center
Alteration
Post-Bid
Huntsville, AL 35811

Alabama A&M University Thomas Wing at Carver Complex HVAC Renovation
Alteration
Results
$3,239,800 est. value
Huntsville, AL

MSFC Huntsville Bldg 4619
Term Contract
Post-Bid
Huntsville, AL 35808

National Boiler Inspection Services
Term Contract
Results

Inspection and Certification of Chemical Fume Hoods, Laminar Flow Hoods, Class Two Recirculating Bio-Safety Cabinets (BSC), Class Two Ducted BSC's, and Associated Alarms
Term Contract
Post-Bid
Huntsville, AL - Fredericksburg, Stafford, VA 22556

HVAC Renovation/Replacement for Highlands Elementary School
Alteration
Results
$2,220,000 est. value
Huntsville, AL 35810

Madison County High School Fluid Cooler Replacement
Alteration
Post-Bid
Gurley, AL 35748

HVAC Filter Maintenance
Term Contract
Results
AL

Reported 05/11/2022 12:00 AM
Project Title

Ralph Lee HVAC Renovation Project

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35811   (Madison County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the demolition of the entirety of the existing mechanical HVAC system including existing chiller and boiler, pumps, hydronic piping, air handling units, fans, ductwork, diffusers, controls, and associated accessories, except specific elements as noted on drawings. A new HVAC system is to be installed which will consist of fan coil units serving individual zones for temperate control and a central DOAS unite for ventilation. A new central air-cooled chiller and boiler with new hydronic distribution piping system will provide heating and cooling. Architectural and Electrical scope is included to support the mechanical renovation. As part of an add alternate, the ground level restrooms next to the game room will also receive a renovation to make them operable including plumbing upgrades under slab. These restrooms will receive new fixtures and finishes.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents