Similar Projects
Repair and Restore Berms
Infrastructure
Conception
$345,000 CJ est. value
Alexandria, SD 57311

10th Avenue Bridge Replacement - City of Belle Fourche
Infrastructure
Conception
$86,200 est. value
Belle Fourche, SD 57717

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

SD63 - Fm the Us212 E Jct to N of the Moreau River
Infrastructure
Design
$14,249,000 CJ est. value
Trail City, SD 57657

New Mitchell High School
New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
Mitchell, SD 57301

Replace Culverts
Infrastructure
Bidding
$531,000 CJ est. value
Watertown, SD 57201

2022 Culvert
Infrastructure
Post-Bid
SD

BIA Route 29 Roadway Widening
Infrastructure
Post-Bid
Wagner, SD

Reinforced Corrugated Steel Culverts
Term Contract
Results
Hayti, SD

BIA Site Number 7-1 Concrete Box Culvert
Infrastructure
Results
Eagle Butte, SD

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

Clay County Jail - Clay County
New Construction, Infrastructure
Pending Verification
$39,000,000 CJ est. value
Vermillion, SD 57069

Signing and Delineation - Gravel Roads
Infrastructure
Conception
$1,507,000 CJ est. value
Mc Intosh, SD 57641

Grading, Interim Surfacing, Replace Str Bridge
Infrastructure
Design
$15,956,000 CJ est. value
Watauga, SD 57660

Last Updated 12/27/2022 05:07 AM
Project Title

Construction of Clay County Road D1 Pipe Replacement 2022

Physical Address View project details and contacts
City, State (County) Vermillion, SD 57069   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all labor, materials (except those listed as owner provided in the plans), and all else necessary for the construction of Clay County Road D1 Pipe Replacement 2022, Vermillion, South Dakota. The bids will be considered by the Board of County Commissioners at the Commissioner Room in the basement of the Clay County Courthouse, 211 West Main St., Vermillion, SD 57069 on September 20, 2022 @ 9:30 AM. All bids shall be made on the bid packet included in the project manual. The Project includes the following work: 1. Excavation and Removal of Existing Pipe Culvert 2.Installation of New Pipe Culvert The work on the proposed improvements is to be entirely completed by November 15, 2022. Each bid shall be accompanied by a bidders security as described. The Successful Bidder will be required to provide Payment and Performance Bonds as described in the Bidding Documents. All bids shall be sealed, shall contain a deposit of the type specified, and may be filed with the Clay County Auditor during normal office hours or hand carried to the meeting prior to the scheduled bid opening, as specified above. Clay County reserves the right to reject any or all bids and to waive informalities.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents