Similar Projects
Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Cynthia Way And Dorthea Way - City of North Salt Lake
Infrastructure
Conception
$416,250 CJ est. value
North Salt Lake, UT 84054

Burke Lane Subdivision
New Construction, Infrastructure
Design
$69,000,000 CJ est. value
Farmington, UT 84025

Well Pump Station
Infrastructure
Design
$900,000 CJ est. value
Farmington, UT 84025

AV Watkins Siphon Replacement Project
Infrastructure
Bidding
$240,000 CJ est. value
Layton, UT 84041

Hill Field Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Syracuse, UT 84075

Clearfield Station Tod Infrastructure Project
Infrastructure
Post-Bid
Clearfield, UT 84015

Jensen Park Shoreline Landscaping Project - Phase 1
Infrastructure
Post-Bid
$100,000 CJ est. value
Syracuse, UT 84075

Antelope Island State Park, White Rock Bay Campground
Infrastructure
Results
$2,245,755 CJ est. value
Syracuse, UT 84075

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Alta Townhomes & Commercial Development
New Construction, Infrastructure - 9,481 SF
Pending Verification
$17,000,000 CJ est. value
Clearfield, UT 84015

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

2700 West: Gentile Street to West Hill Field Road - Layton City
Infrastructure
Conception
$3,000,000 CJ est. value
Layton, UT 84041

RFQ D/B - Hill Air Force Base B225 Area D Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Last Updated 11/29/2022 02:02 PM
Project Title

Bear River Storage / Syracuse Flex Building 4

Physical Address View project details and contacts
City, State (County) Sunset, UT 84015   (Davis County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a flex building. As of November 29, 2022, this project has been approved for permitting. A general contractor has been selected, but not disclosed. While a firm construction timeline has not yet been established, construction is expected to begin in the fourth quarter 2022.

Details

29,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents