Similar Projects
Reported | 05/27/2022 12:00 AM |
Project Title | Work Zone Traffic Control |
Physical Address | View project details and contacts |
City, State (County) | Syracuse, NY (Cayuga, Cortland, Onondaga, Oswego, Seneca, Tompkins Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all labor, materials, machinery, tools, and equipment for the Work Zone Traffic Control for the 2022-2023 Biennial & Interim Bridge Inspection, NYSDOT Region 3, Cayuga, Cortland, Onondaga, Oswego, Seneca and Tompkins Counties in the State of New York. The required traffic control will assist JMT of NY and New York State Department of Transportation (NYSDOT) personnel, or their authorized designee, with the inspection of said bridges. Work shall be performed as described and in accordance with the Manual of Uniform Traffic Control Devices. Required Experience: As the safety of human lives is at risk, the Subcontractor shall have had a minimum of five (5) years documented experience in the performance of traffic control. Additionally, all flag persons shall have had a minimum of six (6) months of documented experience in traffic control. Contract: January 1, 2022, until May 31, 2026. The project period is from June 2022 until May 31, 2024. The majority of the work will be performed from June 2022 through December 2023 with minimal or uncertain amount of work anticipated in 2024. The number of workdays required per crew to provide Work Zone Traffic Control per week will vary from zero to five (0 to 5) days. As many as two (2) to three (3) separate work crews with all necessary equipment and materials may be required to work simultaneously at any time during the Contract. Also, full and partial day and nighttime closures will be required to complete the work. One contract will be awarded for both day and night work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |