Similar Projects
Symrise Pet Food
New Construction, Infrastructure
Conception
$65,500,000 CJ est. value
Hodges, SC 29653

SC 34 over Wilson Creek
Demolition, New Construction, Infrastructure
Conception
$5,479,000 CJ est. value
Greenwood, SC 29646

Big Dan's Car Wash / Greenwood
New Construction, Infrastructure - 3,992 SF
Bidding
$2,000,000 CJ est. value
Greenwood, SC 29649

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Design - PTC Health (H)/Science (S) Building Renovations and Expansion
Addition, Renovation, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Greenwood, SC 29646

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Local Paving Project, 2022
Infrastructure
Results
$647,279 CJ est. value
Greenwood, SC 29646

Greenwood Eye Ambulatory Surgery Center
New Construction, Infrastructure
Pending Verification
$3,984,230 CJ est. value
Greenwood, SC 29646

East Cambridge Residential Development
New Construction, Infrastructure
Pending Verification
$41,000,000 CJ est. value
Greenwood, SC 29646

Dogwood Senior Village Senior Housing Development Phase 1 and 2
New Construction, Infrastructure
Conception
$29,000,000 CJ est. value
Greenwood, SC 29649

Renovation of Ninety Six Town Park
Infrastructure
Post-Bid
$400,000 CJ est. value
Ninety Six, SC 29666

Playground Equipment Including Installation at Ninety Six Town Park
Infrastructure
Results
$219,000 CJ est. value
Ninety Six, SC 29666

Athletic Field Artificial Surface
Infrastructure
Post-Bid
$1,250,000 CJ est. value
Greenwood, SC 29646

Campus Asphalt Paving
Infrastructure
Results
$592,855 CJ est. value
Greenwood, SC 29646

Reconstruction/Rehabilitation - Greenwood Co
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Greenwood, SC 29646

Last Updated 07/07/2023 10:06 AM
Project Title

CCA 60-Inch Sewer Upgrade - Phase 1

Physical Address View project details and contacts
City, State (County) Greenwood, SC 29646   (Greenwood County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of installing approximately 2,576 feet of new 60-inch gravity trunk sewer and 320 feet of new 8-inch gravity connector sewers; installing approximately 11 new precast concrete manholes; crossing one road via bore-and-jack; crossing two roads via open cut; traffic control and pavement restoration as required; lowering the existing grade along a portion of the proposed trunk sewer; installing soil and erosion control devices; performing complete restoration as required; performing bypass pumping as necessary; and performing all other miscellaneous work required to complete the Project. This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP). All federal SCIIP requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM). Bidders must comply with Title VI if the Civil Rights Act of 1964, The Fair Housing Act, Title III of the Civil Rights Act of 1968, Section 504 of the Rehabilitation Act of 1973, the Age Discrimination Act of 1975, Title II of the Americans with Disabilities Act of 1990, the Contract Work Hours and Safety Standards Act, the Clean Air Act, the Federal Water Pollution Control Act, the Copeland Anti-Kickback Act, and all other requirements as described in the SCIIP SPECIAL PROVISIONS. Each bid must be accompanied by a certified check of the Bidder or by a Bid Bond made payable to the Owner, for an amount equal to not less than five percent (5%) of the total bid as a guarantee that, if the bid is accepted, the required Agreement will be executed and that a one hundred percent (100%) Performance Bond and one hundred percent (100%) Payment Bond will be furnished. The Owner reserves the right to waive any informalities in bidding and to reject any or all Bids if it is in the Owners best interest to do so.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents