Similar Projects
Desoto Boat Ramp Go Mesa Project G-DIHMA/19/DI
Post-Bid
Dauphin Island, AL 36528

Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Post-Bid
Mobile, AL 36602

Boardwalk Construction at Graham Creek Nature Preserve
Results
$110,862 est. value
Foley, AL

Roland Cooper State Park Transient Dock Installation
Results
$269,900 est. value
Camden, AL 36726

Tom Jackson Pier Replacement and B.B. Comer Pier Addition
Infrastructure
Post-Bid

Lincoln Tournament Fishing Park Building Boardwalk and Pier Package
Results
$1,800,000 to $2,200,000 est. value
Lincoln, AL 35096

Gulf State Park Pier Structural and Electrical Repairs
Infrastructure, Alteration
Post-Bid
Gulf Shores, AL 36542

Ditto Landing Dock Repair and Stabilization Plan
Results
Huntsville, AL 35803

Waterfront Park Pier Post-Hurricane Sally Repairs
Infrastructure
Post-Bid
$600,000 to $800,000 est. value
Orange Beach, AL 36561

Improvements and Repairs to Marine Resources Boat Slips 1 and 2
Results
$1,653,000 est. value
Dauphin Island, AL

Wooden Pier Repairs
Results
Fairhope, AL

Eastgate Boardwalk Repairs
Results
Ashford, AL 36312

Intracoastal Waterway Boat Launch
Results
Bay Minette, AL

Fairhope Docks Bulkhead Repairs
Results
$329,867 est. value
Fairhope, AL

Little Billy Goat Hole Marine Improvements
Infrastructure
Results
$530,661 est. value
Dauphin Island, AL 36528

Reported 04/27/2022 12:00 AM
Project Title

Construction of 4 New Inshore Reefs Limestone Aggregate and the Installation of 16 Pilings

Physical Address View project details and contacts
City, State (County) Dauphin Island, AL   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall generally consist of the deployment of limestone aggregate within designated boundaries along the water bottoms of 4 new inshore reefs in Mobile Bay, Alabama.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents