Similar Projects
Fargo South University Mixed Use Development
New Construction
Conception
$35,000,000 est. value
Fargo, ND 58103

Crosby Sports Arena & Recreation Center - Phase 2
New Construction
Conception
Crosby, ND 58730

Burning Hearts Church Townhomes
New Construction - 21,122 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Fargo, ND 58078

Boulevard Square III - Phase 1
New Construction - 11,048 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fargo, West Fargo, ND 58103

Mandan New High School BP-1 Earthwork
New Construction
Sub-Bidding
Mandan, ND 58554

Pembina, North Dakota LPOE - Office Renovations
Renovation
Post-Bid
$100,000 to $250,000 est. value
Pembina, ND 58271

Ray Citizens Housing Rehabilitation
Post-Bid
Ray, ND

Ellig Sports Complex Outdoor Track Restoration
Results
Fargo, ND 58102

Athletic Improvements
Results
Forman, ND

Trenton Indian Services Area Expansion
Addition - 3,873 SF
Construction
Williston, ND 58801

Hebron Brick Office Building
New Construction - 10,630 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
West Fargo, ND 58078

Main & Broadway Mixed Use Building
New Construction
Pending Verification
$21,000,000 est. value
Fargo, ND 58103

Main & Broadway Mixed Use Building
New Construction
Pending Verification
$21,000,000 est. value
Fargo, ND 58103

Urban Plains Mixed Use
New Construction
Conception
Fargo, ND 58104

EOLA Apartments at Anderson Park Phase 2
New Construction - 105,000 SF
Design
$10,000,000 CJ est. value
Fargo, ND 58104

Last Updated 08/11/2021 04:30 PM
Project Title

Memorial Village Redevelopment

Physical Address View project details and contacts
City, State (County) Grand Forks, ND 58203   (Grand Forks County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Athletic Facility, Office, Parking Garage
Contracting Method General Contractor to Subcontract.
Project Status Project Delayed, Sub-Bidding Expected first quarter 2022
Bids Due View project details and contacts
Estimated Value $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed use redevelopment to include underground parking and walkways connecting to the Memorial Stadium.

Details

Office, New Construction, Parking Garage, 1 Story Below Grade, New Construction, Apartments/Condominiums, 5 Stories Above Grade, New Construction, Athletic Facility, Demolition, 110,000 to 120,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents