Similar Projects
Last Updated | 12/29/2022 02:03 AM |
Project Title | Keystone Stilling Basin Repairs |
Physical Address | View project details and contacts |
City, State (County) | Tulsa, OK 74103 (Tulsa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,436,417 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract Award Date: Nov 22, 2022 Contract Award Number: W912BV23C0003 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: KZ8QFDN28TJ3 Contractor Awarded Name: MOBLEY CONTRACTORS INC Contractor Awarded Address: Morrilton, AR 72110-9417 USA Base and All Options Value (Total Contract Value): $4436417.04 The U.S. Army Corps of Engineers Tulsa District has been tasked to solicit for and award construction project for repairs to the Keystone Stilling Basin. The Government seeks to repair damages and fill scour holes at the Keystone Lake Stilling Basin. Repairs to concrete will not require the handling of riprap, coarse aggregate, silt, debris, and other foreign material deposited within the stilling basin other than at locations of repairs. Dewatering of the Keystone stilling basins and lowering of the downstream tailwater will not occur during contract performance. All work within the stilling basins will be accomplished under water. The Contractor shall propose the Means and Method to accomplish the work. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W912BV22R0020' to obtain more details.* The cost magnitude of this project is betw een: $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |