Similar Projects
Max Q at Kirtland
New Construction, Infrastructure - 900,000 SF
Conception
$191,700,000 CJ est. value
Albuquerque, NM 87116

RWW-Lake Maloya Dam Safety Improvements - 15247 - City of Raton
Renovation, Infrastructure
Conception
$25,200,000 CJ est. value
Raton, NM 87740

Roadrunner Storage
New Construction, Infrastructure - 100,000 SF
Design
$5,000,000 CJ est. value
Rio Rancho, NM 87124

Tulip Townhomes
New Construction, Infrastructure
Design
$12,100,000 CJ est. value
Rio Rancho, NM 87124

RFQ Contractor - Black Mesa Low Water Crossing
Infrastructure
Bidding
$5,000,000 CJ est. value
Mentmore, NM 87301

Wastewater System Improvements Project - Phase 2
Infrastructure
Bidding
$400,000 CJ est. value
Santa Fe, NM 87501

Native American Lands Environmental Mitigation Program
Term Contract
Sub-Bidding
Santa Ana Pueblo, NM 87004

Price Agreement for the Maintenance of Flood Control Structures
Term Contract
Sub-Bidding
Las Cruces, NM 88001

Joan Jones Community Center at Atrisco Hills Addition Phase 2
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Albuquerque, NM 87105

Mixed-income Affordable Housing Development at Camino De Jacobo - Santa Fe County
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Santa Fe, NM 87501

Old Highway 44 Roadway and Bridge Reconstruction
Demolition, New Construction, Infrastructure
Results
$2,784,573 CJ est. value
Bernalillo, NM 87004

Lincoln National Forest Gravel Pits
Term Contract
Results
Sacramento, NM 88347

Hiland Plaza
New Construction, Infrastructure - 2,000 SF
Construction
$18,000,000 CJ est. value
Albuquerque, NM 87108

RFP Engineering - Southside Water Reclamation Plant (Swrp) Outfall Restoration Project Design
Infrastructure
Pending Verification
$4,994,567 CJ est. value
Albuquerque, NM 87105

Beckner Road Medical Office Building
New Construction, Infrastructure - 95,000 SF
Pending Verification
$55,200,000 CJ est. value
Santa Fe, NM 87505

Last Updated 09/23/2022 06:31 AM
Project Title

Willow Creek Restoration

Physical Address View project details and contacts
City, State (County) Reserve, NM 87830   (Catron County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Introduction. The USDA Forest Service, Gila National Forest, Reserve Ranger District has a requirement for Willow Creek Restoration project, Ben Lilly Campground, Catron County, New Mexico, 87830. Project consists of using heavy equipment that (outside designated Wilderness Area) may include backhoe, dump truck, excavator with thumb, front end loader, and hydraulic post hole digger. This equipment would be used only as necessary to move and/or place large material in channel according to design specifications. All necessary permits would be secured with US Army Corps of Engineers for work conducted within the ordinary high-water mark. 2. Type of Award. As a result of this solicitation, the Government anticipates awarding a Firm Fixed-Price Construction Contract using FAR 15 Request For Quotation (RFQ) Lowest Price Technically Acceptable format. This is a 100% Small Business Set Aside to NAICS code 237990 $39.5 Million is the maximum size standard to qualify as small business. PSC code Z1PC. To be eligible for award of a Federal contract, potential vendors, at time of award, need to have an active registration in the System for Award Management (SAM) . 3. Basis for Award - See Section M (last section of this document). 4. How to submit your offer. Submit RFQ pages 3 through 5 as your business (schedule of items) proposal. In a separate document, submit all the information requested in Section M as your technical proposal. Deadline for submission of offers shall be September 23, 2022, Noon (Pacific Daylight Time - matches time zone in advertisement in SAM). Responses to the RFQ shall be sent to the Contract Specialist by email before the Noon deadline and should contain the Solicitation Number in the subject line for the email. Email: warren.abbott@usda.gov 5. No Formal Site Visit has been scheduled. Offerors are encouraged to make their own assessment of the site and level of work necessary for successful project. Informal site visit requests may be made with the Contracting Officer's Representative (COR): Contracting Officer's Representative (COR): Harley Allsup, Facilities Engineer Ph: 520-404-3728 harley.allsup@usda.gov Any questions concerning the RFQ, or procurement procedures shall be sent in writing to Contract Specialist (CS): daniel.franco@usda.gov or warren.abbott@usda.gov . SCOPE OF CONTRACT The USDA Forest Service, Gila National Forest, Reserve Ranger District has a requirement for Willow Creek Restoration project, Ben Lilly Campground, Catron County, New Mexico, 87830. Project consists of using heavy equipment that (outside designated Wilderness Area) may include backhoe, dump truck, excavator with thumb, front end loader, and hydraulic post hole digger. This equipment would be used only as necessary to move and/or place large material in channel according to design specifications. All necessary permits would be secured with US Army Corps of Engineers for work conducted within the ordinary high-water mark. Exhibits: Exhibit 1 - U.S. Department of Labor, Wage Determination Exhibit 2 - Schedule of Items Exhibit 3 - Statement of Work Exhibit 4 - Maps C1.2 MAGNITUDE OF CONSTRUCTION PROJECT Magnitude of Construction Project: Between $25,000 and $150,000. PROJECT LOCATON AND PERIOD OF PERFORMANCE Location: The project is located on the Gila National Forest, Reserve Ranger District. To reach Willow Creek: From Reserve, NM take State Highway 435 going south for 6.5 miles until you reach FSR 141. Follow FSR 141 for approximately 30 miles going east until you reach FSR 28. Follow FSR 28 going south for approximately 15 miles to reach County Road 073. Follow County Road 073 for about a mile and you will reach the Ben Lilly Campground reach of the Willow Creek Restoration Project. Under normal conditions the project area is accessible with a 2-wheel drive vehicle. It shall be the responsibility of the contractor to determine the most suitable route to the project area. All the transportation of equipment, personnel, and supplies will also be the responsibility of the contractor. Period of Performance: Work shall start sometime after October 1, 2022 and shall completed before September 30, 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents