Last Updated 02/12/2020 11:59 AM
Project Title

Construction Management Services

Physical Address View project details and contacts
City, State (County) Arlington, TX   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Management (CM) services for the following projects: • Lake Arlington Raw Water Pump Station Improvements (LARWPS): AWU owns and operates the LARWPS which is rated with a total pumping capacity of 240 million gallons per day (MGD) and a firm pumping capacity of 180 MGD (largest pump out of service). The joint project with AWU and Trinity River Authority (TRA) is currently in design to rehabilitate the existing Lake Arlington Raw Water Pump Station. Construction scope generally includes rehabilitation or replacement of pumps, electrical, instrumentation, HVAC, structural, architectural, and piping. The total estimated construction cost is $25 million. Construction is expected to start in March 2020. • John F. Kubala Water Treatment Plant (JKWTP) Backwash Improvements: JKWTP is rated at 97.5 MGD. The construction scope includes removal of the existing filtered water control weir gate and installation of an independent backwash water system including an elevated storage tank and pump station. The total estimated construction cost is $5 million. Construction is expected to start in late 2020.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents