Last Updated | 06/03/2022 01:22 AM |
Project Title | Irrigation Lateral 119.64-7.5 Replacement Project - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Palm Desert, CA (Riverside County) |
Category(s) | Heavy and Highway, Sewer and Water, Single Trades |
Sub-Category(s) | Landscaping/Irrigation, Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,900,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work and paving for a mixed-use development in Palm Desert, California. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. Response Types Line Items General Attachment (required) Type of Award Lump Sum License Requirements Bidders are required to possess a Class A or C34 license Bid Valid 60 days after bid opening Liquidated Damages $1,000 for all work Estimated Bid Value $2,500,000 to $2,900,000 Start/Delivery Date June 13, 2022 Project Duration 365 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 04/28/2022 1:00 PM (PDT) The project consists of furnishing and installing RCP baffle stand and surge gate near regulatory meter; C900 & 909 PVCO pipe, including valves, fittings, restrained joints, surface restoration, and all appurtenances, complete and in place; furnishing and installing one master meter vault assembly, one regulatory meter vault assembly and four meter delivery vault assemblies, including all fittings, valves, appurtenances, and equipment; and installing temporary bypass system. Work shall also include protecting in place or removing and replacing all existing utilities and private and public improvements, including, but not limited to, berms, curbs, gutters, concrete pavement, asphalt concrete pavement, walkways, sidewalks, , trees, cross gutters, spandrels, driveways, slopes, mail boxes, landscaping irrigation facilities, traffic striping, signs, fences, seasonal crops, and orchard trees. This project does not require disinfection of the irrigation pipelines. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Women Business Enterprise (WBE) - entities that are at least 51% owned and/or controlled by women; |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |