Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

RFQ Design - Design Consultant - Bridging Architect for City Hall Renovation Project - Phase I
Demolition, New Construction, Infrastructure - 30,000 SF
Conception
$500,000 CJ est. value
Fontana, CA 92335

Project P-1238 Construction of Grid Stability & Resiliency 10 Mw Battery Energy Storage, Various Buildings
New Construction
Design
$10,364,940 est. value
Twentynine Palms, CA 92277

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

2022 HSIP Traffic Signal Modifications at Various Locations
Infrastructure
Bidding
$615,000 CJ est. value
Rancho Cucamonga, CA 91730

WA221 and WA222 - Central Avenue and Dupont Avenue Waterline Replacement Project
Infrastructure
Bidding
$2,166,399 CJ est. value
Chino, CA 91710

Hilltop House Demolition
Demolition, Infrastructure
Sub-Bidding
$230,000 CJ est. value
Apple Valley, CA 92307

CSA 70, R-40 Upper North Bay Road Chip Seal Project
Infrastructure
Sub-Bidding
$200,000 CJ est. value
San Bernardino, CA 92352

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

Stanfield Cutoff Restroom Site Preparations Project
Infrastructure
Results
$300,000 est. value
Big Bear Lake, CA

Campus Accessibility and Site Improvements Project
Infrastructure
Results
$2,000,000 est. value
San Bernardino, CA

San Bernardino County Transportation Tunnel
New Construction, Infrastructure
Pending Verification
$492,000,000 CJ est. value
Rancho Cucamonga, CA 91730

Carbon Canyon Road Improvements (South of Chino Hills Parkway) - City of Chino Hills
Infrastructure
Conception
$500,000 CJ est. value
Chino Hills, CA 91709

Primrose Street Cannabis Facility
New Construction - 213,000 SF
Design
$23,000,000 est. value
Adelanto, CA 92301

Last Updated 07/25/2022 11:14 AM
Project Title

SAFStor / San Bernardino

Physical Address View project details and contacts
City, State (County) San Bernardino, CA 92411   (San Bernardino County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a self storage facility. As of July 25, 2022, an architect has been selected. This project is currently out to bid. The content management team has made an inquiry for all bid information. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. *Subcontractor bidding may be ongoing for select trades. Interested subcontractors should contact the awarded general contractor to check on available bidding opportunities.

Details

3 Stories Above Grade, 105,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents