Similar Projects
Wastewater Treatment Plant
New Construction
Design
Buena Vista, GA

Withlacoochee WPCP Lab And Shop Bldg Design And Construction
New Construction
Bidding
Valdosta, GA 31601

Municipal WWTP Upgrades
New Construction
Bidding
Moultrie, GA 31768

Snake Creek Water Treatment Plant Expansion
Addition
Post-Bid
Carrollton, GA 30112

Thermal Dryer Equipment Selection
Post-Bid
Athens, GA

Ridgewood Water Production Facility
Results
Brunswick, GA 31520

Modifications to the Water Pollution Control Plant
Results
Dawsonville, GA 30534

2018 Camp Creek Water Reclamation Facility Improvements
Construction
College Park, GA

Pumpkinvine Creek WPCP 1.5MGD Expansion
Construction
Dallas, GA

New River WPCP and Southwest LS Upgrades
Renovation
Bidding
Tifton, GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Post-Bid
Cedartown, GA

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Etowah Water Treatment Plant - Plate Settler Design
New Construction
Bidding
Ball Ground, GA 30107

Water Treatment Plant #1 Aerator Replacement
Post-Bid
Kingsland, GA 31548

Install Infrastructure for Pilot Study
Results
Cumming, GA 30040

Last Updated 04/26/2021 08:42 AM
Project Title

Water Treatment Plant - 2020 Clearwell and High Service Pump Station

Physical Address View project details and contacts
City, State (County) Elberton, GA   (Elbert County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,146,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of constructing a new 750,000-gallon cast-in-place clearwell and high service pump station, completing ground improvements, constructing new electrical building and service entrance with generator, installing 3 new high service pumps with VFDs and associated piping, renovating two clearwells, completing miscellaneous yard piping and site work, and all related appurtenances.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents