Similar Projects
CDBG-DR Project - St. Augustine Boulevard and Cypress Road Drainage Improvements
Bidding
FL 32086

St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14, St. Johns County, Florida
Bidding
FL

Design-Build Services for Moultrie Trails Area Drainage Improvements
Results
Less than $1,997,028 est. value
Saint Augustine, FL 32084

Dredged Material Management Area Du-2 and SJ-1 Shoreline Improvements
Results
Less than $1,467,747 est. value

Clean and Desilt Box Culverts
Results
Less than $250,000 est. value

Santa Maria Boulevard Drainage Improvements
Results
Less than $2,173,000 est. value
Saint Augustine, FL 32084

3rd Alley Ditch Drainage Improvements
Results
Saint Augustine, FL 32080

Deep Creek Conservation Area - Ditch Blocks Installation
Results
Less than $59,310 est. value
FL

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Second Call - Halfmile Creek Mitigation Area, Trail Road Improvements and Low Water Crossing
Results
Less than $22,000 est. value
FL

Fabrication and Installation of Removable Flood Barriers for the Waste Water Treatment Plant
Results
Saint Augustine, FL

FEMA Project - Old A1A South Berm Restoration
Results
Less than $1,152,098 est. value
FL

CDBG-DR Project: Avenue D and Tart Road Drainage Improvements
Results
Less than $680,364 est. value
Saint Augustine, FL 32084

Drainage Repair on SR 207
Results
Less than $240,000 est. value
FL

Design-Build Services for Hurricane Matthew FEMA Cat. B Emergency Berm Restoration
Results
Less than $11,584,996 est. value
FL

Last Updated 05/06/2021 12:05 PM
Project Title

Winton Circle Drainage Improvements

Physical Address View project details and contacts
City, State (County) FL 32086   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall be responsible for providing any and all labor, materials, equipment, and supervision required in order to construct drainage improvements along Winton Circle in St. Johns County. Improvements included in this project consist of work completed in two (2) separate construction phases. The limits of work for each construction phase are shown on sheet 2A (Construction Phasing Detail) of the Roadway Plans. Phase I construction includes roadway reconstruction/raising the profile grade along Bella Terra Drive (approximately 480 linear feet). Additional improvements include expanding an existing pond to the designed limits, along with construction of a new County-maintained control structure and outfall pipe system along Bella Terra and US 1. Fencing shall be required along the entire perimeter of the stormwater management facility which includes two double ten-foot gates. Work also includes clearing and grubbing, erosion control measures, and maintenance of traffic. Additionally, any features belonging to property owners that are impacted by the proposed construction will require relocation and/or replacement. Phase II construction includes roadway reconstruction/raising the profile grade within a residential neighborhood along Winton Circle (approximately 665 linear feet). The project also includes new stormwater piping and ditch regrading throughout the project area to provide conveyance to the new stormwater management facility constructed under Phase I of the contract. Additional improvements include installation of multiple side-drain culverts and supporting drainage infrastructure within the residential neighborhood, as well as reconstruction of multiple residential driveways throughout the project area. Work also includes clearing and grubbing, erosion control measures, pavement cut/repair, maintenance of traffic, and pavement markings. Additionally, any features belonging to property owners that are impacted by construction will require relocation and/or replacement. Phase II construction also includes the installation of a new six-inch water main along Winton Circle (approximately 1,900 linear feet) and grouting the existing six-inch water main to place it out of service. Utility work also includes the installation/ adjustment of existing hydrants, valve boxes, meters, and the connecting lateral connections to the new water main. All water main work associated with this project shall be in accordance with the “2006 St. Johns County Manual of Water, Wastewater and Reuse Design Standards and Specifications”.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents