Similar Projects
Cape May Terminal Police Dispatch Center Rehabilitation
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$805,000 CJ est. value
Cape May, NJ 08204

21st Street and 25th Street Bridges Over Avalon Canal Scour / Erosion and Substructure Repairs
Infrastructure
Bidding
$200,000 CJ est. value
Avalon, NJ 08202

T0278 - Concrete Curb, Sidewalk and Gutter Construction - NJDOT
Infrastructure
Post-Bid

Ocean Drive (CR 619) 62nd Street to 80th Street Resurfacing Improvements in the Borough of Avalon
Infrastructure
Post-Bid
Avalon, NJ 08202

Reconstruction of Miami Avenue, Florida Avenue, Jacksonville Avenue, Tampa Avenue and Elks Lodge Alley
Results
Villas, NJ 08251

Swainton Road Project
Results
Cape May Court House, NJ

Beach Avenue Hotel
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Cape May, NJ 08204

114th Street Sanitary Sewer Main Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Stone Harbor, NJ 08247

Bikeway Network Expansion
Infrastructure
Post-Bid
Cape May, NJ 08204

Beach Street End Public Access Improvements - Phase 1
Results
$1,200,000 est. value
Wildwood Crest, NJ 08260

Franklin Street and Adams Avenue Reconstruction and Water System Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Woodbine, NJ 08270

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Roadway Resurfacing Milepost 0 to 122
Results

Pier Fender Replacement and Repairs at Cape May and Lewes Terminals
Infrastructure
Bidding
$1,000,000 CJ est. value
Cape May, NJ 08204

Fabrication and/or Installation of Structural Steel & High and Low Pressure Pipe Work
Infrastructure
Post-Bid
$190,000 CJ est. value
Camden, NJ 08104

Last Updated 09/23/2022 11:13 AM
Project Title

Boardwalk Rehabilitation - Oak Avenue to 26th Avenue Phase II Maple to 26th

Physical Address View project details and contacts
City, State (County) N Wildwood, NJ 08260   (Cape May County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,449,595 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work for this Contract includes the rehabilitation of the Wildwood Boardwalk from Oak Avenue to Maple Avenue. The rehabilitation work consists of the removal and replacement of the existing timber portions of the existing boardwalk; removal and replacement of the existing boardwalk railings; the removal of the existing concrete trolley slabs and beams; the repair of the existing concrete substructure; the installation of new concrete beams as part of the substructure; reconstruction of existing timber boardwalk outcrops and installation of new timber stairs. The Owner will award one contract for this project. Awarding of the Contract is anticipated for July 7, 2022, with Notice to Proceed anticipated being awarded by July 21, 2022. No on-site construction activities may commence until October 3, 2022. Substantial Completion on this contract shall be completed by May 5, 2023. Bidders may submit questions in writing only to the office of the Design Engineer at richard.maloney@colliers engineering.com until 5:00 p.m. on Friday, June 17, 2022. Proposals must be made on the standard Proposal Forms in the manner designated in the Contract Documents, must be enclosed in sealed envelopes bearing the name and address of the Bidder, and the name of the work on the outside; addressed to Carl Groon, Municipal Administrator, 4400 New Jersey Avenue, Wildwood, New Jersey, 08260; and must be accompanied by a statement of Consent of Surety from a surety company authorized to do business in the State of New Jersey and acceptable to the City and either a Bid Bond or a Certified Check drawn to the order of Treasurer of the City of Wildwood for not less than ten percent (10%) of the amount bid, except that the check need not exceed $20,000.00. The successful bidder is hereby notified that a performance bond for the full amount of the project is required. The award of the Contract for this project will not be made until the necessary funds have been provided by the City of Wildwood in a lawful manner. By virtue of Executive Order #34 (1976), vendors currently suspended, debarred or disqualified are excluded from participating on this project. Proposals for this Contract will only be accepted from bidders who have properly qualified in accordance with the requirements of the Contract documents. The right is also reserved to reject any or all bids or to waive any informalities where such informality is not detrimental to the best interest of the City. The right is also reserved to increase or decrease the quantities specified in the manner designated in the Specifications. The successful bidder shall be required to comply with the following: A. Affirmative Action requirements (P.L. 1975, C.127, N.J.S.A. 10:5-1 et seq.). B. The provisions of the New Jersey Prevailing Wage Act (N.J.S.A. 34:11-56.25 et seq.). C. Anti-Kickback Regulations under Section 2 of the Act of June 13, 1934, known as the Copeland Act. D. Worker and Community Right-to-Know Act (N.J.A.A. 34:5A-1). Moreover, the bid must be accompanied by a list of names and addresses of all stockholders owning 10% or more of the stock in accordance with the provisions of the Public Disclosure Law (P.L. 1988, C.33, N.J.S.A. 52:25-24.2).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents