Similar Projects
Lead Abatement Contractors for the City's Lead Hazard Control and Healthy Home Program
Term Contract
Bidding
Allentown, PA

Environmental Hazard Abatement Services
Term Contract
Bidding
Indiana, PA

Asbestos Abatement Police Old Zone 3
Post-Bid
Less than $30,000 est. value
Pittsburgh, PA 15203

Asbestos Abatement at Foose Elementary School
Post-Bid
Harrisburg, PA 17104

Asbestos Removal Services
Results
Less than $25,000 est. value
Chambersburg, PA 17201

Asbestos Abatement Monitoring and Project Oversight at Air Route Surveillance Radar (ARSR) sites throughout the United States
Results
Seligman, AZ - Lincolnton, Marietta, GA - Maiden, NC - Albuquerque, Gallup, NM - Brecksville, London, OH - Clearfield, PA - Rogers, TX - Bedford, VA

Solid Waste and Recycling Material Collection
Infrastructure
Bidding
Greensburg, PA

Mold Remediation
Post-Bid
$22,000 est. value
Frackville, PA

Asbestos Abatement and Remediation at Air Route Surveillance Radar (ARSR) Sites Throughout The United States
Results
Seligman, AZ - Lincolnton, Marietta, GA - Maiden, NC - Albuquerque, Gallup, NM - Brecksville, London, OH - Clearfield, PA - Rogers, TX - Bedford, VA

Asbestos Abatement, Structure Demolition, and Site Restoration
Post-Bid
Erie, PA 16507

F--Dirt Crawl Space Testing for Asbestos Coatesville VAMC
Results
Coatesville, PA 19320

Sludge Hauling
Term Contract
Post-Bid
Conyngham, PA 18219

New Hope-Solebury High School Asbestos Abatement and Flooring Replacement
Results
New Hope, PA 18938

Sludge Removal
Post-Bid
Buckingham, PA 18912

FRP MATOC North-East Region
Results

Last Updated 10/21/2021 03:01 PM
Project Title

DDSP Sewage Sludge Removal

Physical Address View project details and contacts
City, State (County) New Cumberland, PA   (Cumberland County)
Category(s) Environmental
Sub-Category(s) Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall remove and dispose of up to 300,000 gallons of non-hazardous liquid wastes (referred to as sludge in the remainder of the SOW) annually from the Defense Distribution Center, Susquehanna (Installation) Sewage Treatment Plant aerobic digester, SBR, and post aeration tank. The cost per gallon identified in Attachment 2- Schedule of Services includes all labor, equipment, vehicles, transportation, and disposal. The Contractor shall remove and dispose of up to 8,000 gallons of non-hazardous solid wastes (referred to as sludge in the remainder of the SOW) annually from the Installation Sewage Treatment Plant aerobic digester, SBR, and post aeration tank, and from lift stations located throughout the Installation. The cost per gallon identified in Attachment 2- Schedule of Services includes all labor (where confined space entry is not required), equipment, vehicles, transportation, and disposal. The Contractor shall remove and dispose of up to 30,000 gallons of non-hazardous liquid wastes (referred to as sludge in the remainder of the SOW) annually from Installation lift stations. The cost per gallon identified in Attachment 2- Schedule of Services includes all labor, equipment, vehicles, transportation, and disposal. The Contractor shall remove and dispose of up to 100,000 gallons of non-hazardous liquid wastes (referred to as sludge in the remainder of the SOW) annually from Sewage Treatment Plant equalization tank, influent screening room and other areas of the plant not including the digester, SBR, and post aeration tank. The cost per gallon is identified in Attachment 2- Schedule of Services. The Contractor shall remove and dispose of up to 10 tons of non-hazardous solid wastes (referred to as sludge in the remainder of the SOW) annually from Sewage Treatment Plant equalization tank, influent screening room and other areas of the plant not including the digester, SBR, and post aeration tank. The cost per ton is identified in Attachment 2- Schedule of Services Contractor is responsible to ensure none of the limitations included in Attachment 2- Schedule of Services are exceeded during the year and to notify the Installation GOVERNMENT POC when limitations in Attachment 2- Schedule of Services are within 20% of the limitation included in Attachment 2- Schedule of Services.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents