Similar Projects
Pinto Lane Streetscape Improvements Phase 1 - Shadow Lane To Martin Luther King Boulevard
Alteration
Bidding
$3,218,624 to $3,894,535 est. value
Las Vegas, NV

East Channel Construction Earl N. Jenkins Elementary School
Infrastructure
Bidding
$610,000 est. value
Las Vegas, NV 89142

Muller Parkway Improvement Project
Post-Bid
$9,400,000 est. value
NV

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Nellis Meadows: Park Improvements Irrigation Renovation and North Parking Lot Rehabilitation
Results
$4,966,543 to $5,227,941 est. value
Las Vegas, NV

Mount Charleston Kyle Canyon Fire Station - Erosion Control
Results
$140,600 to $148,000 est. value
Mount Charleston, NV 89124

2021 Drainage and Roadway Improvements G Street and Shriver Boulevard
Results
$740,118 est. value
Sparks, NV

Centennial 2635 Zone Reservoir and 2745 Zone Pumping Station
New Construction
Results
$30,383,200 est. value
Las Vegas, NV

Marlette Lake Broodstock Facilities/Passage Improvement Project
Infrastructure
Results
$110,577 est. value
Reno, NV

Last Updated 06/21/2021 02:03 PM
Project Title

FWRC Secondary Treatment Expansion Preloading

Physical Address View project details and contacts
City, State (County) Las Vegas, NV   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,100,000 to $11,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an earthen embankment utilizing approximately 300,000 cubic yards of soil from two separate borrow sites located at the Flamingo Water Reclamation Center The soil is to remain in place and the site is to be monitored for approximately 12 months. Dust control is to be maintained at all work sites during construction and duration of preloading. For safety assurance, 2 flagpersons shall be utilized at the Rochelle Ave crossing for Borrow Site 1. An additional 2 flagpersons shall be used as directed by the owner, when construction activities are active at Borrow Site 2. Once consolidation is sufficient, the soil will be moved back to the borrow pits and the borrow pits will be restored. Rerouting of a new 750 foot electrical ductbank located at the west end of the preloading site.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents