Similar Projects
Honors College - Modesto Maidique Campus - Florida International University
New Construction, Infrastructure - 78,000 SF
Conception
$25,745,334 CJ est. value
Miami, FL 33174

Science Laboratory Complex - Modesto Maidique Campus - Florida International University
New Construction, Infrastructure - 124,462 SF
Conception
$93,130,000 CJ est. value
Miami, FL 33194

NW North River Drive Multifamily
Demolition, New Construction, Infrastructure - 6,800 SF
Design
$50,000,000 CJ est. value
Miami, FL 33136

Eleven44
New Construction, Infrastructure - 16,607 SF
Design
$3,600,000 CJ est. value
Miami Beach, FL 33141

Town of Surfside 96th Street Park
LEED Certification, Infrastructure
Bidding
$4,954,500 CJ est. value
Surfside, FL 33154

71 NOBE
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Miami Beach, FL 33141

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Y--Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Firm Fixed Price Multiple Award Construction Contract, NAVFAC SE Area of Operations
Results
$20,000,000 to $900,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Renovations and Addition Project - 427 Biltmore Way
Renovation, Addition - 12,356 SF
Construction
Less than $2,400,000 est. value
Coral Gables, FL 33114

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

100 Miracle Mile
New Construction, Infrastructure, Renovation - 37,000 SF
Pending Verification
$40,000,000 CJ est. value
Coral Gables, FL 33134

Academic Health Center Study Complex - A20 - Florida International University
New Construction, Infrastructure - 33,133 SF
Conception
$41,600,000 CJ est. value
Miami, FL 33174

Last Updated 10/20/2022 08:39 AM
Project Title

GO#27: Log Cabin - 26919 - City of Miami Beach

Physical Address View project details and contacts
City, State (County) Miami Beach, FL 33139   (Miami-Dade County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,076,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct the historic Log Cabin to restore and re-open for community use. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of October 20, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents