Similar Projects
Public Safety Building Construction
New Construction
Conception
Louisville, OH

Murphy USA #7122 / Canton
New Construction, Infrastructure - 2,800 SF
Conception
$1,500,000 CJ est. value
Canton, OH 44702

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Gregory Industries Office Building
New Construction, Infrastructure - 19,192 SF
Design
$4,000,000 CJ est. value
Canton, OH 44710

Soccer Complex at Schuring Park Project
New Construction, Infrastructure - 32,500 SF
Bidding
$8,385,000 CJ est. value
Jackson Belden, OH 44718

SR 43 - Minor Reconstruction
Infrastructure
Bidding
$1,274,100 CJ est. value
Plain Township, OH 44721

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

ModWash / Alliance
New Construction, Infrastructure - 4,600 SF
Pending Verification
$1,000,000 CJ est. value
Alliance, OH 44601

Waikem Car Wash
New Construction, Infrastructure - 4,554 SF
Pending Verification
$1,000,000 CJ est. value
Canton, OH 44720

Arlington Road Widening & Intersection Improvements - City of Green
Infrastructure
Conception
$12,229,359 CJ est. value
Uniontown, OH 44685

Paving
Infrastructure
Design
$200,000 CJ est. value
Waynesburg, OH 44688

SR 687 - Four Lane Resurfacing
Infrastructure
Bidding
$1,893,700 CJ est. value
Jackson Belden, OH 44718

Last Updated 11/29/2022 03:07 PM
Project Title

Collection Systems Service Center Garage Addition and Administration Offices Renovation

Physical Address View project details and contacts
City, State (County) Canton, OH 44702   (Stark County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Parking Garage, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $2,588,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 22, 2022, construction is underway. The City of Canton will receive bids for the Collection Systems Service Center Garage Addition and Administration Offices Renovation. Questions regarding specifications should be addressed in writing to Purchasing Department, at purchasing@cantonohio.gov. The total estimated construction cost for the Base Bid Work for the Project for which bids are being solicited at this time is $2,860,000.00. The estimated cost for Alternate 1 - Remove existing gas line and replace with new gas line from meter to generator, due to possible conflict with subgrade elevation at new parking spaces. is: $4,000.00. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents