Similar Projects
Last Updated | 06/21/2023 06:04 PM |
Project Title | Press Box Building for St. Charles High School |
Physical Address | View project details and contacts |
City, State (County) | Saint Charles, MO 63301 (Saint Charles County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Athletic Facility, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $820,500 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of demolishing the existing Press Box Building and relacing it with a new one for St. Charles High School. For project related questions, please contact Dickinson Hussman Architects (Dwight Dickinson) at (ddickinson@dharch.com) or (Lisa LeMasters) at (llemasters@dharch.com). Bidders must provide a Bid Bond in the amount of 5% of the proposed contract sum. The successful bidder will be required to provide 100% Performance and Payment Bonds, comply with the Missouri Department of Labor Standards Prevailing Wage Rates, and be enrolled in the E-Verify Federal Work Authorization Program. The owner reserves the right to reject any and all bids. The scope of the project is to furnish, install, commission and place into operation an H.V.A.C. system that meets the intent of the design and the goals of the owner and users as outlined in the bid documents. Additionally, existing HVAC systems shall be modified as detailed on the bid documents. The Division 15 contractor shall provide all equipment, controls, labors, sub-contractors and accessories required to install a fully operational system. All coordination between trades is the sole responsibility of the contractor. The contractors proposal shall include all items that are required by code, industry accepted practices and the standards incorporated in the performance specification *As of April 24, 2023, addendum 3 has been issued. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |