Similar Projects
Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 est. value
Kansas City, MO 64121

Mace Road Sidewalks - City of Kansas City
Infrastructure
Conception
$260,000 est. value
Kansas City, MO 64152

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

Baseline Improvements to Town Fork Creek
Infrastructure
Results
Kansas City, MO 64130

Indian Creek Trail Improvements
Infrastructure
Results
Kansas City, MO 64114

AC Rialto Hotel
Renovation, Infrastructure - 169,000 SF
Construction
$65,700,000 CJ est. value
Kansas City, MO 64106

D/B-Design Build Services for a New Detention Center Facility
LEED Certification, New Construction, Infrastructure
Construction
$256,500,000 CJ est. value
Kansas City, MO 64133

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Longview Tract by The Bay Water Park - City of Kansas City
Infrastructure
Conception
$315,000 est. value
Kansas City, MO 64134

Pacific + Troost Residential
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Kansas City, MO 64106

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Last Updated 05/25/2023 06:35 AM
Project Title

Asphalt Repair and Installation

Physical Address View project details and contacts
City, State (County) Oak Grove, MO 64075   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

High School East Drive - remove and repair asphalt patch on the east drive next to the high school, approximately 10' x 50' *Primary School NW Drive - remove and repair asphalt patch on the west end of the north drive to primary *High School South Parking - remove and repair asphalt areas on the west end of the south parking lot approximately 20' x 20' - Potholes and missing asphalt toward the service drive at Panther Stadium *Elementary North Parking - remove and repair asphalt from parking spaces *Campus - Approximately 5 potholes of various sizes from 3ft. diameter to 8ft. diamete Repair and Installation of Asphalt in Various Parking Lots on the Oak Grove Campus

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents