Similar Projects
On-Call Electrician
Bidding
Leominster, MA

Padmount Transformers
Bidding
Shrewsbury, MA

Low Voltage Services/T.S.
Term Contract
Post-Bid
Worcester, MA 01608

UPS Replacement - Regional Emergency Communications Center (RECC)/ TS
Post-Bid
Less than $120,000 est. value
Worcester, MA

Little League Field Lighting
Results
Sturbridge, MA

Lock-Up and Accessibility Improvements, Fitchburg District Courthouse - Filed Sub-Bids
Renovation
Results
Less than $408,317 est. value
Fitchburg, MA 01420

Oversight, Monitoring of WHA Energy Performance Contract - Phase II
Post-Bid
Worcester, MA 01605

Generator Replacements - Pump Stations / DPWP
Results
Less than $575,000 est. value
Worcester, MA 01608

Bagg Hall Restoration - Filed Sub-Bid
Post-Bid
$1,050,000 est. value
Princeton, MA 01541

Minor Electrical Services 2020-2022 (School Department)
Term Contract
Results
Leominster, MA 01453

Aegen Thermo Power 75LE Co-Gen Systems
Post-Bid
Less than $110,000 est. value
Worcester, MA 01605

General Contractor Engine Maintenance and Repairs for Generators
Results
Less than $950,000 est. value
Bedford, Boston, Framingham, Worcester, MA

Aegen Thermo Power 75Le Co-Gen Systems
Post-Bid
Less than $100,000 est. value
Worcester, MA 01605

Narrows Road Facility Hydrogenerator and Marshall Regulating Plant Pumps - Filed Sub Bid
Results
Fitchburg, MA 01420

2 Transformers and Bases for UMASS Amherst-Tobin Hal
Post-Bid
Shrewsbury, MA 01545

Last Updated 03/18/2021 10:39 AM
Project Title

Buffumville Lake Electrical Upgrades, Charlton, MA

Physical Address View project details and contacts
City, State (County) Charlton, MA   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project has the following major components. New Generator and automatic transfer switch installation to be located outside in a sound attenuated enclosure with a sub-base fuel tank, behind the Utility Building. Removal of existing generator in the Control House New Power Panel and feeder conductors at the gate tower Replacement of the gate controller feeds in the gallery New main service disconnect and panels in the project office Replacement of the service disconnect and power panel in the original Operators’ Quarters Upgrade the camp site electrical service Temporary standby emergency power during electrical work disconnects

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents