Similar Projects
East Miller Road Expansion - City of Republic
Infrastructure
Conception
Less than $1,000,000 est. value
Republic, MO 65738

MM Five Lane Part 3 - City of Republic
Infrastructure
Conception
$4,000,000 est. value
Republic, MO

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Farm Road 115 and State Highway EE Roadway Improvements
Results
Springfield, MO

Major Street Resurfacing
Infrastructure
Results
Springfield, MO

MM Five Lane Part 2 - City of Republic
Infrastructure
Conception
$3,200,000 est. value
Republic, MO

Jefferson Avenue Footbridge Rehabilitation
Renovation, Infrastructure
Post-Bid
Less than $3,200,000 est. value
Springfield, MO

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Miller Road Extension (West of Miller Crossing subdivision) - City of Republic
Infrastructure
Conception
Less than $500,000 est. value
Republic, MO 65738

Building Demolition and Site Cleanup (List 10-26)
Demolition, Infrastructure
Post-Bid
Springfield, MO

Kansas Expressway Extension Phase I
Infrastructure
Results
Springfield, MO

Bailey Extension 2 - City of Republic
Infrastructure
Conception
Less than $300,000 est. value
Republic, MO 65738

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Intersection Improvement
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
MO

Last Updated 07/21/2022 04:03 PM
Project Title

Fassnight Creek Greenway Trail

Physical Address View project details and contacts
City, State (County) Springfield, MO 65806   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $459,895 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes: removing existing 10 ft asphalt trail across Phelps Grove Park between Clay Ave and Virginia Ave, and replacing it with 10 ft concrete trail, constructing new 10 ft concrete trail from Virginia Ave along Fassnight creek to the Springfield Art Museum, and constructing a new pedestrian bridge across Fassnight creek. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. The City of Springfield hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Springfield reserves the right to reject any or all bids. The DBE Goal for this project is 0%. No 2(TM) tier subcontracting will be allowed on this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents