Similar Projects
Stormwater Pipe Rehabilitation, Replacement, Desilting and Video Inspection
Infrastructure
Bidding
$425,000 est. value

Stormwater Pipe Rehabilitation, Replacement, Desilting and Video Inspection
Infrastructure
Bidding
$425,000 est. value

South Campus Stormwater Management - DRA #4 Project
Post-Bid
Pembroke Pines, FL 33024

Keystone Drive Nutrient-Separating Baffle Box and Upflow Filter Water Quality Improvement Project
Post-Bid
Less than $862,000 est. value
Orlando, FL 32806

Furnish and Install 24-Inch Sanitary Force Main Along NW 170 St. from NW 97 Ave. to NW 75 Place, Contract No. S-947
Results
Less than $5,851,177 est. value
Miami, FL

Post-Storm Emergency Repairs
Results
FL

Stormwater Contractor Continuing Services
Term Contract
Bidding
Less than $4,000,000 est. value
Orlando, FL

Construction Services
Post-Bid
FL

Picayune Strand Restoration Project Southwest Protection Feature Levee, Collier County, Florida
Results
$25,000,000 to $45,000,000 est. value
FL

Construction Manager at Risk Services for 7th Street North and 50th Avenue North and Vicinity Storm Drainage Improvements
Infrastructure
Bidding
Saint Petersburg, FL 33747

Construction Services for Project Improvements Phase 3D also known as Riverstone Phases 5 and 6
Post-Bid
FL

Slip Lining for Gravity Sewer Lines
Results
FL

Directional Drill Services - Naples Beach Restoration and Water Quality Improvement Project
Infrastructure
Bidding
$3,300,000 est. value
Naples, FL

Maintenance and Cleaning of Retention Ponds, Ditches, Swales
Term Contract
Post-Bid
Less than $50,000 est. value
FL

Airport Stormwater Improvements
Results
Less than $571,000 est. value
Stuart, FL 34996

Last Updated 11/24/2021 01:14 PM
Project Title

Illinois Avenue Pipe Lining Project

Physical Address View project details and contacts
City, State (County) Saint Cloud, FL 34769   (Osceola County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to repair the existing metal stormwater pipes by designing and installing a cure-in-place liner for pipes ranging from 24” to 60”.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents