Similar Projects
Galvanized Water Line Phase 3 and Abingdon Water Storage Tank Replacement Project Construction Administration / Post Construction Services Request for Statements of Qualifications (RFSOQ)
Post-Bid
Abingdon, VA 24212

Water Tank Maintenance Services
Post-Bid
Middleburg, VA 20117

F--Cleaning and Removal Tank Fluids
Term Contract
Results
Norfolk, VA 23511

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Construction of Repairs and Recoating to Water Tanks
Results
Craigsville, Haynesville, Mitchells, VA 22472

High Density Lime Slurry and Storage Tanks
Term Contract
Results
Woodbridge, VA 22191

Construction - Underground Storage Tank Removal Dublin VA
Results
$25,000 to $100,000 est. value
Dublin, VA 24084

Penderwood Tank 3 Rehabilitation
Results
$984,799 est. value
Fairfax, VA 22031

Water Tank Rehabilitation
Results
$514,000 est. value
Buckingham, VA 23921

5,000 Gallon Hydropneumatic (Northfields Tank) Exterior Spot Repaint, Wet Interior Repaint and Miscellaneous Repairs
Results
$38,000 est. value
Charlottesville, VA 22911

Western Branch Tank Rehabilitation
Results
Less than $781,500 est. value
Chesapeake, VA 23328

Removal of Water Tank at Roanoke County's Explore Park
Results
$14,885 est. value
Roanoke, VA 24014

Airport East Water Storage Tank and Pump Station
Results
$6,100,000 est. value
Hanover, VA 23069

Last Updated 06/08/2020 04:03 PM
Project Title

Dominion Valley Tank Residual Control System

Physical Address View project details and contacts
City, State (County) Woodbridge, VA   (Prince William County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all materials, equipment and labor necessary for the construction of Dominion Valley Tank Residual Control System. The work includes, but is not limited to the following: 1. Mobilization: Limited to a maximum of three percent (3%) of the total of all other items. 2. Residual Control System – Installation of complete residual control system, submersible mixer, related equipment, chemical storage, and all related work and appurtenances as shown in the Contract Documents and as necessary for the prosecution of Work. 3. Chemical System Enclosure – Installation of pre-packaged chemical system enclosure and all work and appurtenances as shown in the Contract Documents and as necessary for the prosecution of the Work. 4. Electrical and Instrumentation – Installation of all electrical equipment and related work for the Residual Control System, installation of new Communications Panel (including all instrumentation equipment, i.e. temperature probes), installation of SCADA antenna, relocation of existing water quality monitoring equipment, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work. 5. Structural – Placement of concrete pad and installation of aluminum stairs and platform for the Chemical System Enclosure and all related work as shown in the Contract Documents and as necessary for the prosecution of Work. 6. HVAC Ductwork – Installation of ductwork between the Chemical System Enclosure and tank fluted column wall, tank fluted column wall ductwork penetration, associated welding and existing tank coating system repair, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work. 7. Plumbing – Installation of all fixtures, piping, supports, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work. 8. Piping – Installation of chemical feed piping, sample piping, piping supports, sample line tank penetration, associated welding and existing tank coating system repair, and all related work as shown in the Contract Documents and as necessary for the prosecution of Work. 9. Demobilization and Closeout – All work related to demobilization of project site and closeout as required by the Contract Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents