Similar Projects
Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Bowling Alley Force Main Installation
Infrastructure
Bidding
$70,000 est. value
New Johnsonville, TN

2021 Supplemental Environmental - Sewer System Improvements
Infrastructure
Bidding
Westmoreland, TN 37186

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Design/Build Services to Repair/Replace the Sanitary Sewer System at the Jacobs Civilian Conservation Center
Post-Bid
$500,000 to $1,000,000 est. value
Bristol, TN

East Ridge Sewer Basin 3C and 4B Rehabilitation
Results
Chattanooga, TN

Sewer Pipe
Term Contract
Results
Chattanooga, TN 37402

Sprinkler System
Renovation
Construction
Clarksville, TN 37040

Various Water and Sewer Maintenance Items
Term Contract
Bidding
Kingsport, TN

Upper Station Camp Creek Sewer Extension
Post-Bid
Gallatin, TN

Sanitary Sewer Cured In Place Pipe Lining (CIPP) Blanket Contract
Results
Less than $2,000,000 est. value
Chattanooga, TN 37402

2020 CDBG II Sewer System Improvements
Infrastructure
Bidding
Dandridge, TN

Belinda City Lateral Lining
Post-Bid
TN 37122

Storm and Sanitary Sewer Revisions at Lupton City Mill
Results
Less than $598,589 est. value
Chattanooga, TN 37402

Construction Installation for the Water, Gas, and Wastewater Systems
Infrastructure
Bidding
Lenoir City, TN

Last Updated 01/11/2022 12:59 AM
Project Title

Phase 1 Sewer Rehabilitation Group 2 CIPP

Physical Address View project details and contacts
City, State (County) Memphis, TN   (Shelby County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work for this bid generally consists of installing cured in place pipe (CIPP) on approximately 37,000 linear feet of 8” – 21” diameter gravity sewer. In most cases the work will include, but is not limited to, any pre-cleaning necessary to complete the lining, performing point repairs in preparation for lining, installing the CIPP liner, reinstating laterals, and completing manhole rehabilitation on select manholes in the area. Other related work will include providing traffic control and restoring any disturbed area.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents