Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Culverts
Term Contract
Post-Bid
WI

Concrete Culverts
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Erosion Control Devices
Term Contract
Post-Bid
WI

Shoreline Stabilization
Results
Oconomowoc, WI 53066

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

CTH T - CTH G, Calamus Creek Bridge, CTH T - CTH G, Beaver Dam River Bridge
Results
WI

Pond and Drainage System Construction
Post-Bid
De Pere, WI

Town of Ithaca, Mcavoy Hill Road, Little Willow Creek Bridge
Results
WI

2021 Culvert Pipes
Post-Bid
WI

Town of Clayton, Tiller Road, Pigeon Run Creek Bridge, English Run Creek Bridge
Results
Clayton, WI 54004

Concrete Box Culverts
Post-Bid
WI

CTH BB - STH 130, Branch Bear Creek Bridge
Results
WI

Last Updated 04/05/2022 01:38 PM
Project Title

Colfax Wastewater Treatment Plant Slope Stabilization

Physical Address View project details and contacts
City, State (County) Colfax, WI 54730   (Dunn County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to prepare design documents for and build a riverbank stabilization / erosion protection project along the Red Cedar River adjacent to the Colfax WWTP lagoons. This project w ill also consist of constructing an access road to the project site, modifications to a WWTP lagoon effluent pipe that discharges out of the eroding slope, providing effluent sampling point access and reinstallation or replacement of the fence along the top of the riverbank.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Soil Stabilization, Shotcrete Soil Slope Stabilization.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents