Similar Projects
Sunrise River Highway 61 Wetland Enhancement
Infrastructure
Bidding
$1,100,000 CJ est. value
Columbus, MN 55025

Riverview Heights Highrise Plumbing Upgrades
Renovation
Sub-Bidding
$655,900 CJ est. value
Moorhead, MN 56560

Hastings HS Valve & Fitting Replacement
Post-Bid
Hastings, MN 55033

Water Softener Installation
Post-Bid
Faribault, MN

Plumbing Service
Term Contract
Results
$250,000 est. value
Moorhead, MN

John Rich Fountain
Alteration
Results
Red Wing, MN 55066

2022 Seasonal Work and Materials
Term Contract
Post-Bid
Faribault, MN

General Contractor for 1314 North 44th Avenue Piping
Alteration
Results
Minneapolis, MN 55412

Pipe Insulation
Term Contract
Post-Bid
MN

Century High School - Pool Addition - Bid Package 02
Alteration
Results
Rochester, MN 55906

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

Twin Cities Habitat for Humanity Plumbing
Alteration
Post-Bid
Saint Paul, MN 55106

2021 Plumbing Infrastructure Upgrade Program
Alteration
Results
Minneapolis, MN

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Last Updated 09/12/2022 01:31 PM
Project Title

Lac Qui Parle WMA- Killen Unit Moist Soil Unit Drain Tile and Bypass

Physical Address View project details and contacts
City, State (County) Appleton, MN 56208   (Swift County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $512,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

State Project No. 2023- 048-02-8W203 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be done under one prime contract that includes: Pipeline construction and appurtenant work, erosion control and turf restoration. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. 32,100 LF of 4-inch perforated HDPE 2. 2,350 LF of 10-inch non-perforated HDPE 3. 450 LF of 18-inch non-perforated HDPE 4. 3,000 LF of 24-inch PVC Pre-Bid Meeting Info: No pre-bid meeting scheduled Together with related items of work, erosion controls and turf restoration designed to help maintain the soil moisture within two floodable cells and divert excess stored water to a third cell at the Lac Qui Parle WMA - Killen Unit. Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Jeremy Schmid, email: jeremy.schmid@state.mn.us, Telephone: (507) 233-1243. Final completion of the work will be on or before August 25, 2023.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents