Similar Projects
Pump Replacement
Infrastructure
Bidding
$2,260,337 to $2,498,268 est. value
Brooklyn, NY 11210

Preliminary Design, DES and DSDC for the Reconstruction of the Main Sewage Pump System at Red Hook WRRF
Term Contract
Bidding
New York, NY

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

United Wappinger Water District - Hilltop Well Connection
Post-Bid
Less than $320,000 est. value
Wappingers Falls, NY 12590

Merriewold Wellfield Improvements
Results
Blooming Grove, NY 10914

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Services Decommissioning of Monitoring/Recovery Wells within All Five (5) Boroughs of New York City
Term Contract, Infrastructure
Bidding
New York, NY

Water District 12 Wellfield Improvements Project
Post-Bid
Monroe, NY 10950

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Replacement of Well No 4B
Infrastructure
Bidding
Rockville Centre, NY

Submersible Pumps
Post-Bid
White Plains, NY 10601

Town of Watson Water District #4 Extension #1
Results
Less than $6,000,000 est. value
Lowville, NY 13367

Rehabilitation of Well No 1A
Infrastructure
Bidding
Rockville Centre, NY

Replacement of the Fire Pump at Riverview Towers and Replacement of the Water Heaters
Post-Bid
Less than $230,000 est. value
Ogdensburg, NY 13669

Furnish and Deliver Decant Pumps and Mixers for Erie County Water Authority
Results
Cheektowaga, NY 14227

Reported 12/02/2021 12:00 AM
Project Title

Well and Booster Pump Maintenance Contract

Physical Address View project details and contacts
City, State (County) Plainview, NY 11803   (Nassau County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Service, repair, testing and maintenance of well and booster pumping equipment including electric motor and gear drives at the locations listed in Appendix B and in accordance with all prevailing safety and labor regulations. Duration of contract is January 1, 2022 through December 31, 2022 (12 mos.) with an option for two one (1) year extensions.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents