Similar Projects
Grayson Well 69 (Replacing Well 274)
Infrastructure
Bidding
$2,449,000 est. value
Grayson, Modesto, CA 95363

Southern Pump Station Project
Infrastructure
Bidding
$6,200,000 est. value
El Centro, CA 92244

Chilled Water Pump Project
Infrastructure
Post-Bid
Marysville, CA 95901

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Post-Bid
Elk Grove, CA

Treated Water Booster Pumps
Alteration
Results
CA

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Bidding
Anaheim, CA

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Well Abandonment Project
Infrastructure
Results
Riverside, CA 92519

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Bidding
Colton, San Bernardino, CA 92324

Plumas National Forest Brush Creek Fuel Pump Repair
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Berry Creek, CA 95916

Drilling of Water Wells North Long Beach 13 and North Long Beach 14
Infrastructure
Bidding
Long Beach, CA 90899

Install Chill Water Pumps
Term Contract
Post-Bid
CA 95652

Well and Pump Maintenance and Repair
Infrastructure
Bidding
$114,000 est. value
Napa, Suisun City, CA 94585

Well and Pump Maintenance and Repair
Infrastructure
Bidding
$255,000 est. value
Davis, CA 95618

Reported 09/11/2021 12:00 AM
Project Title

Martin Slough Flow Enhancement Project

Physical Address View project details and contacts
City, State (County) Eureka, CA 95503   (Humboldt County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the furnishing of all labor, equipment, and supervision for installation of one exploratory boring, down to a maximum depth of 300-feet below the ground surface, conversion of the boring into a test well, electric logging of the boring for lithologic logging, and pump testing.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents